Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Meeting Scope

  • Track state of Icarus competition frame

  • Get Houston ready for possible QR Code integration testing

Other Concerns

Flight Test Outlook

Date

Note

April 29th

  • Icarus frame testing - hover and quad flight, possible transition

  • Test Houston autonomy with QR Code integration

April 8/9th

Subteam

Tasks (replace these w/asana links when you can)

Owner

Mechanical

Cornflakes frame is complete

Conall Kingshott

Alison Thompson

Electrical

Cornflakes Wiring as required:

Ethan Abraham

Hamza Ali

Sysint

End-to-end testing of system

Aidan Bowers (Deactivated)

Logistics

Logistics

  • ensure vehicles, submit FTR, verify bookings.

  • Submit flight test plan

  • Vehicle logistics

  • Ensure checklists are being followed

  • Fill flight box

Hardy Yu

Competition Frame (Icarus Aircraft)

Component

Tasks (replace these w/asana links when you can)

Owner

Mechanical

cabin is together, holes to be drilled for seats? - Alison Thompson to do this tomorrow, as well as holes for sensor mounting

cut hole/ decide mounting spot for circular tail antenna

will need to dremel avionics bay

servos mounted and welded

one vert stab is a little tilted

landing gear concern, what if it lands hard and dislodges upwards

push prop updates it is attached but tilted because composites canada QA sucks

LED lights mounted?

Conall Kingshott

Megan Spee

Electrical

Updates:

Ethan Abraham

Systems Integration

Updates:

  • Pixhawk Setup

  • Jig testing

  • Camera and VTX Verification

(warning) want to run a flight test with only comp attendees - with the 5 flightline people decided - April 21st?

  • No labels