Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Meeting Scope

  • Track state of Icarus competition frame

  • Get Houston ready for possible QR Code integration testing

Other Concerns

Flight Test Outlook

Date

Note

April 29th

Icarus frame testing - hover and quad flight, possible transition

April 8/9th

Subteam

Tasks (replace these w/asana links when you can)

Owner

Mechanical

Cornflakes frame is complete

Conall Kingshott

Alison Thompson

Electrical

Cornflakes Wiring as required:

Ethan Abraham

Hamza Ali

Sysint

End-to-end testing of system

Aidan Bowers (Deactivated)

Logistics

Logistics

  • ensure vehicles, submit FTR, verify bookings.

  • Submit flight test plan

  • Vehicle logistics

  • Ensure checklists are being followed

  • Fill flight box

Hardy Yu

Competition Frame (Icarus Aircraft)

Component

Tasks (replace these w/asana links when you can)

Owner

Mechanical

Conall Kingshott

Megan Spee

Electrical

Updates:

  • State of Icarus wiring diagram (System Block Diagram)

    • RFC Created, not merged yet

    • One change to make - will be approved and merged by April-5-2023

  • Questions on power architecture and other follow-up from RFC re last week

    • Power architecture RFC Merged

  • Information: 2023 System Architecture

  • Top-down physical electronics layout

    • In its starting stages, working on referencing previous layout proposal

    • Will have RFC out by April-6-2023

  • SMEs:

Nolan Haines

Michael Botros

(warning) want to run a flight test with only comp attendees - with the 5 flightline people decided - April 21st?

  • No labels