Attendance
Introduction
Announcement of /wiki/spaces/Meetings/pages/2851930130 .
EE
Comp Relevant PCBAs
Water controller
POR assembly this weekend/ as soon as boards come in
no firmware required
Water controller Rev 2
Making a rev 2 to add extra output if we need to use solenoid
Targeting design done end of week - discuss purpose of this?
does this also need to be assembled asap? should the bringup of this board next term be very high priority?
LED REV 4
POR early next term
do we have a deadline for bringup for this? if not, when?
Tracking antenna controller rev2
POR assembly early next term
Unified VTX
POR sometime next term
components ordered
Tom Chiu will be onsite to drive this
is this still viable for comp 2025?
Single servo driver - handed off for firmware
Pi interface rev c
halfway through routing
on track - end of term
SIM card holder out of stock - looking into alternatives
Discuss comp priority?
Comp Critical Bringup Priority List
Should we make any changes to this list? No deadlines as of rn besides water controller being ready for Dec 14th FT.
Water Controller Rev 1 - assembly this term
LED controller rev 4 - assembly this term likely pushed
Tracking Antenna Rev 2
Unified VTX
Water Controller Rev 2
Wiring
harness for RPi has been completed and handed off to autonomy for further testing
details: copied from Jerry’s discord message:
the raspberry pie system is ready for ground test. There are 3 cables to the RPi Rev B PCB, the UART kill switch cable is plugged in but the other two cables were not plugged in. xt30 power cable is straightforward, just connect the female connector to the male connector on the pcb. For the telemetry cable, unplug cable in the pixhawk telem3 port rn and plug the one coming from rpi in Uart killswitch cable is connected to pixhawk io pwm port 8. I think I told you yesterday, but I didn't include any details so here you go
EFS
Tracking Antenna
Yaw and Pitch tracking are both working
Currently working when TA is manually placed to face north (Yaw 0 degrees is north)
Otherwise, there is a calibration issue, will be looked over today
Ready for flight test on Nov 23rd
Mech
Payloads on track - waiting for filament
angled landing gear coming on Saturday
Autonomy
IR camera different settings tested on ground, IR beacon is still pretty bright (min exposure time + max ISO) OneDrive
Cluster estimation integrated and tested
MAVlink communication in development
IR camera integration is almost complete, just testing remains
Will push more for bright spot detection once we lock in camera settings, although we have preliminary algorithms ready (not integrated)
Camera test plan:
Set low shutter speed (
ExposureTime
) to make image darkerPlay around with iso values to see what allows for beacon to be seen (
AnalogueGain
) without noiseWill be ready for flight test once proper values to set are found. Most likely will have some preset values for the camera settings and try them at flight test to see which shows up the best.
Camera testing progress:
Settings were found at Wednesday’s worksession
Used
ExposureTime:36
,AnalogueGain:16
,Brightness:0
Thursday’s worksession, not enough time to properly test, team members needed help with their tasks
Set to take pictures at different
ExposureTime
values, need to see which value makes the most sense to use
Will test a bit more on Friday, hopefully there is some sun to test in, otherwise will test in cloudy weather and see how it turns out.
Flight Tests
2024-11-23
Autonomy data collection
IR and CV again, collection went well last weekend
This test will change parameters for the IR cam to try to get better images
Cluster estimation for geolocation
Tracking antenna test
Pegasus pilot training
Leave at 9 AM??
Asana
Check and update timeline