Meeting overview
Meeting to discuss all aspects of the command & control system for AEAC 2024
Tracking Antenna (hardware)
ELRS Configuration (including gemini, airport, etc)
Ground-station software & scripting
Table of Contents
📝 Meeting minutes & decision log
< to be filled out during the meeting >
📡 Tracking Antenna Updates
Mechanical
Item | Notes |
---|---|
Introduction | Topics of Discussions
|
Current Design Photos & Videos | Picture of the Current Design For Patch Antenna Tracker
Potential Changes
Previous Design of Antenna Tracker for Yagi Antennas
|
Questions |
|
New Constraints / Conclusions / Rough Notes | going for 2-3 weeks for a prototype that can rotate |
Software
Yuchen Lin to fill out
mavlink passthrough in progress
planning to port neo m8 and bmx 160 driver to f401, and develop the motor control algorithm
create an integration test code and ready for test flight
Electrical
@nolan haines or Hardy Yu to fill out
Yuchen solder the perf board for integrating the nucleo and all the peripherial connection.
📶 Gemini Updates
Electrical
Schematic phase
Deadlines assigned in Asana