Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Big Project

Project

Project Manager

Cabin

Iterations of the Cabin

Evan Janakievski Sohee Yoon

Task Description

Physical assembly of the cabin and future updates or considerations are documented here.

Assignees

Assignee

Asana Task

Date

@ assignee

link to asana task assigned

Date assigned

Task Progression/Updates

Author: Sohee Yoon Date: 2024/02/01

First Iteration Notes:

  • Successfully made the cabin (only skeleton and aeropanels)!

  • NEED A BETTER WAY TO ASSEMBLE (without having to assemble with the drone)

    • Ability to assemble the cabin together THEN mount to the drone

  • Front and Back aeropanels do not completely line up with the side panels

    • Must fill the gap

    • Make aeropanels curved

  • Aeropanel mounting holes did not line up properly so Evan Janakievski and I had to drill holes in the aeropanels to align with the mounts

    • Possible solutions:

      • Consider the bending and extra layer of carbon fiber for the holes on the mounts

      • Mounts can be redesigned with slot holes and use hex nuts instead of heat inserts

  • Barbie does fit into the cabin but we will have to test with seats soon!

  • No labels