Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Current »

Meeting overview

Meeting to discuss state of Competition Aircraft big quad.

  • Timeline recap

  • Integration recap

  • EE Clarity

๐Ÿซ‚ Attendance


  • Daniel

  • Michael

  • Nathan

  • Conall

  • Arjun

  • Megan

  • Anni

  • Mena

  • Neel

๐Ÿ—’๏ธ The Weekly Recap


โœˆ๏ธ Flight Tests:

  • Vanny SUCCESSFULLY completed auto-tune

  • Noticed thrust loss on Motor 3 after Battery Failsafe โ†’ Investigation ongoing.

    • This is (not) expected behaviour.

  • CV Landing pad detection works.

  • RTK GPS not tested airside

    • works on the ground

๐Ÿ“ฆ New arrivals

  • HERE RTK GPS Base stations here.

  • Carbon Fiber tubes here.

โœ…ย Open action items


@Anni to look at static load testing

Conall Kingshott Composites stuff never properly setup, not a problem that we had not given to him, Graeme figuring everything out and then letting us know. Composite manufacturing in the next two weeks.

๐Ÿ“ย Meeting minutes


Frame Updates ๐Ÿš

MECHANICAL

Composites in the next two weeks, before midsun gets it in (midsuns stuff is massive nad takes a while)

  • Try and get as many people in the room as possible.

Frame updates

  • Starting on landing gear prints

  • MCMaster Carr order for standoff stuff & miscallaneous items.

  • Talking to Les (machinist). Will likely have to do a lot of this ourselves and then send it off to him to finish (battlebots causing issues).

Sensor Updates ๐Ÿ“

  • RTK GPS?

RF updates ๐ŸŒ

  • Need notch filters? 5W video very much stepping on other freqs? not sureโ€ฆ. currently investigating

Motor 3-phase connectors โœ…

MECHANICAL ELECTRICAL INTEGRATION

Battery PDB Distribution (question)

ELECTRICAL

  • How are batteries going to be arranged in series/parallel?

    • Scuffed diagram that needs explanation of potential implementation for three 12S batteries

  • How will our board support this layout?

Airside Electrical Layout (error)

ELECTRICAL MECHANICAL INTEGRATION

  • Where each component goes needs to be added to the architecture document.

  • Need selection of proper wire gauges, types, etc.

    • https://www.engineeringtoolbox.com/wire-gauges-d_419.html

    • For Battery connections, 8 AWG can be used to handle 75A continuous (maybe a little lower if stranded)

      • Stranded likely needed in order to have the required flexibility

    • For motor connections, each motor draws around 15A (determined when discussing MT-30s)

      • 14 AWG wire (24A) should be enough for ESC connections to PDB

  • No labels