\uD83E\uDD14 Problem Statement
The ZP2 program failed due to a multitude of issues surrounding lack of experience from the Electrical team and the inability to bring up the board in time. ZP1.5 was used in the 2022 competition season, but the architecture of the system has been questioned as it was merely inherited from a team rather than designed ourselves. ZP3 aims to address many of the hardware changes that are requested by the team.
🕵️♂️ Project Details
\uD83D\uDDD3 Timeline
\uD83D\uDEA9 Milestones and deadlines
Milestone | Owner | Deadline | Status |
---|---|---|---|
5 ZP3rev1 boards assembled |
| ||
ZP code ported to new board | ? | ||
ZP3rev2 assembly | |||