Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Attendance

Electrical:

Embedded Flight Software:

  • Aidan Bowers

Agenda

Table of Contents
minLevel2
maxLevel6
outlinefalse
styledecimal
typelist
printablefalse

Powertrain

Action items / blockers:

Updates:

  • < Decision documentation >

  • No updates, we have 6 total motors for peggy not 8

  • Final comp configuration

Mech

Electrical

EFS

Autonomy

Action items / blockers:

Updates:

  • Use pre-made waypoint file for task 1

  • Task 2 will be the auto script

Mech

Electrical

EFS

Autonomy

Video System

Action items / blockers:

Updates:

Electrical

EFS

Autonomy

  • Made VTX board to bring to qualia site tour

Mech

  • Record DVR of received video

  • Add ep2 receiver to video board for controls

Flight Control System

Action items / blockers:

Updates:

  • Increased loiter jerk to 500 cm/s^3

  • Disable compass 1 (internal)

  • Recalibrate compass at comp, collect magfit data friday and regenerate parameters

  • Control failsafe at 10s, GCS at 15s for now. Test GCS on ground tomorrow. If GCS failsafe works, disable RC failsafe.

Mech

Electrical

EFS

Autonomy

Airframe

Action items / blockers:

Updates:

  • < Decision Documentation >Waterproofing will only be run if it is raining

  • Will be ready for comp

  • Weather is looking good so far

  • Test waterproofing latex cut with beige latex first

Mech

  • Waterproofing will be completed tomorrow

Electrical

EFS

Autonomy

Lighting Photoshoot

Action items / blockers:

Updates:

  • < Decision documentation >In media ingest, photos complete

Mech

Electrical

EFS

Phase 2 Presentation

Emma Chan

Action items / blockers:

  • Georgia taking lead

  • Sync after this call to discuss the split of presentation/notes

  • Ideal to practice at least once before leaving?

Updates:

  • < Decision documentation >Having sync after AEAC about the presentation

Mech

Electrical

EFS

Tracking Antenna

Action items / blockers:

Updates:

  • < Decision Documentation >Gemini board not performing properly, low link quality

  • Bring tracking antenna to comp

  • Bring gemini boards, test range during qualia site tour

  • Operate tracking antenna manually

Mech

Electrical

EFS

  • From the flight test last Saturday, the Gemini system was performing badly on its signal strength (worse than directly connecting to the controller).

  • Tracking antenna has a bug in its motion such that it rotates for multiple rounds at the setup which makes it hard to use.

  • Question: What we should use as RC link for comp?

Autonomy


General Updates

  • Last AEAC sync before comp!

  • Comp travel team: meet in bay at 6am on Thursday before departure, target 7am 6:15am to leave

    • Smile & Daniel on trailerless

    • Aidan & Nathan in trailered

Competition Specific Notes

  • We want to minimize actions we have to take on the flight line. Things like writing waypoints, loading batteries, and attaching battery shrouds can be done in the hangar beforehand

  • Start preparing flight report. Due 90 minutes after task 2 flight.

  • Is gemini being run? status?

    • Test board in bay, prove functionality

    • Test during qualia tour

  • Yuchen on printing the checklists for the judges to see

    • Print flight test docs

    • Pre-takeoff checklists

  • Mounting handicap sign

    • Printed, mount tomorrow

  • Review of competition roles for 2024-05-17 Competition Attendees Sync

  • Waterproofing Strat

    • do nothing unless needed, wait for it to for sure rainning first

    • conformal coat main line of defen

    • latex next but caution with the antennas makes it tough ← see above discussion

  • Packing Plan

    • Start 2pm, Daniel Puratich leading will be there to coordinate

    • Start 6pm, we bring in trailer and get it all going in there

    • End 9pm, time for drivers to sleep

    • All timeline’s in gcal

Flight test schedule

  • No more flight tests before competition!

Questions