...
https://docs.google.com/spreadsheets/d/14LrQwCOgLY2KWGltfEA_Iuvgpcdo-YQpI9kA0cAzQO0/edit#gid=0
| Updates | Action Items |
---|
| Updates | Action Items |
---|
Phoenix | PID Tuning Rig | Comp Drone | Ground Tower | Flight TestingComp Drone | CAD Conall: updates were made to main assembly that rolled back changes to parts and broke stuff main assembly was rolled back to a state that could be fixed reminder: each assembly has an owner, please do not upload changes to assemblies without checking with the owner should we move forward with current system with more strict guidelines or a checkout system
MFG H-Frame: Conall aluminum parts are close to completion carbon fiber: emma to follow up with prof about using water saw fly and crash this prototype of the H-frame as many times before making the real one
Wings Tail Fuselage all 3D printed connectors - wait for CF reinforced filament manufacture 1 structural layer CF sheet 3 less structural CF sheets
| Will attach a list of assembly owners must checkin with an assembly owner before editing an assembly assembly owners: it is your responsibility to make sure two people aren’t editing your assembly at the same time do this through the #grabcad channel threads or forums for checkin-checkout status of each assembly
MFG Emma-Lee Keeping - follow up with prof about water saw use |
Phoenix | No updates Changes to arms to improve assembly | |
Ground Tower | Ground Tower for video Ground Tower for Telemetry | |
CAD guidelines | See Comp drone section haha | |
Comp drone timeline overview 6-Week Aircraft
Comp drone manufacturing Manufacturing Timeline - 3 weeks