Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents
stylenone

Meeting times:

  • EE Meeting: Wednesdays 6 PM EST E5 21034106

  • Leads Meeting: Tuesday 7 PM EST online + E7 2103

  • Various architecture syncs, timing avail on gcalEE Worksession: Sundays 1-4PM in the Bay

  • Comp Architecture sync tonight @ 8 PM EST E5 2103

  • Team Social with Midsun and Orbital this friday 7-10 PM E7 2409

 

 

...

Attendance

Quick Links

 

Updates this week

Goals For the Term

  • Bring Up Boards

    • esc can adapter x 5 (Meghan)

    • 12S Buck x3 (Ishman)

    • CAN Splitter x 5 (Daniel)

    • Single Servo Module x 5 (Daniel)

    • Keyboard x 5 (Nathan)

    • Tracking Antenna Board x 5 (Ryan)

    • 6s servo module x 5 (Meghan)

    • 6S Power Module x 5 (Andrew)

    • LED board 30.5x30.5 x 5 (Parker)

    • rpi interface rev b x3 (daniel)

    • LED board motor mount x 5 (daniel)

    • GPS breakout x 3 (Ria)

  • Design Boards

    Will hear more about them later

    • Long term vision boards

    • Let me (Ryan) know if you’re interested

    • Second priority (after bring-up)

  • Harness the Drones

  • Attend Flight Tests to provide support

...

  • Join arch syncs to understand the system - Wednesdays at 8.

  • Fill out the Team Roster: https://forms.microsoft.com/r/ka0MJHJQ9D

    • Everyone who has completed the bootcamp MUST fill it out every term

    Meghan Dang Presentation on Monday
    • Introduction to adding components into the Altium library with a live walkthrough

  • First Team Social: Friday, September 20 @ 7 PM in E7 2409 (Second floor Ideas Clinic)

    • Joint social with Midnightsun Midnight sun and Orbital

    • Bring board games and baked goods! 

 

Active Projects

 

LED Board Rev 1

(Parker)

 

 

Sensor Cluster

(Michael)

 

 

ESC CAN Adapter

(Meghan)

  • Meghan Dang

  • boards & components ordered, awaiting for assembly on Sept 22nd work sesh

 

https://uwarg-docs.atlassian.net/wiki/spaces/EL/pages/2596929559/6S+Servo+Module?search_id=ef05e725-2bcc-4564-9027-46ecc31c5be8

(Meghan)

  • Meghan Dang

  • boards & components ordered, awaiting for assembly on Sept 22nd work sesh

 

 

Unified Video System

(Tom)

 

 

GPS CAN Adapter

(Omar)

 

 

ELRS Redundant Diversity RX

(Nolan)

 

 

12S Servo Module

(Jerry)

  • Jerry Tian

  • another board assembled, but buck is not working, investigating

  • Likely inrush current problem

 

 

48V->12V,8V,5V @ 3A BEC (Buck Converter)

(Ishman)

 

 

Tracking Antenna Controller Improvements

(Ryan)

 

 

12S Power Module

(Taim)

 

 

6S ESC

(Rayyan, Mostafa)

 

 

Boost Converter

(Allan)

 

 

Smoke Stopper

(Anthony)

 

 

6S Power Module (Andrew)

  • Andrew Chai

  • Included in early September board order, will arrive soon
  • Work sessions: Sundays at 2pm

    • First session will making some of the same board all together to learn how it is done.

    • After that we will all get our own boards to do work on.

  • New Project Managers:

    • Jerry: Pegasus 2 PM

    • Meghan: Board Validation PM

    • Andrew: Board Bring-up PM

    • Parker: Bootcamp PM

    • Feel free to seek help for them with these things!

Miscellaneous Tasks (Let me know if you are interested in doing)

  • Researching a hotplate to order (Timeline: ASAP)

  • Disassembling a monitor for IMACS (Timeline: Very soon)

Discussing Meeting Times

  • 6pm still works for everyone

  • Some people have class at 6:30

  • Before 6 is fine but may be hard for coop people

  • Same room and same time is locked in recurring every week E5

Active Projects

  • 12S ESC

    • Ethan Abraham

    • AM32 open source library locked in

    • Original FOC algorithm as backup

    • Finalized MCU pinout

    • Review next week

  • LTE Breakout

  • 12s Servo Module Jerry Tian

    • On hold to focus on comp critical Peggy 2 tasks.