Attendance

General Updates

...

Board Name

status

blockers

plan going forward

GPS Breakout

  • where are those gps boards

need to order new GPS boards

Ria Prakash

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=e839dcd8-defc-42f1-8280-8e2c21fbeea5

Single Servo Driver

  • Buck and LDO confirmed to be working. Load and efficiency testing completed, looks good. Load transient testing in progress

  • blocked by firmware people right now ..

Load transient testing → EFS Firmware testing

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=726878aa-bcb8-4728-9eed-18483cfb5c94SingleServoDriverEfficiency.pngImage Removed

6s Power Module

  • Both sides assembled

  • Still needs some cleanup with connectors and AFE chips

  • Buck was validated somewhat last week, once cleanup is done, testing should be done on all 3

  • Need to validate the rest of board, checking for continuity and shortsSome small rework fixes but mostly good to go for firmware

  • Needs firmware for other side to do voltage and current sensing using the AFE chips

 

Peggy 2/Comp Updates

  • Jerry Tian For Peggy 2

  • Did not make progress

  • Tracking antenna, water controller on order

  • Single servo on firmware

  • This week working on pi harness

    • Giving out to pi rev c people

  • make harness schem on tinycad

Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

  • The below boards should be included

    • 6S servo module rev 2 - On midterm order - assembly likely next term

    • Single Servo Driver - waiting on EFS

    • 6S power module - in validation Andrew Chai for details

      • POR for first flight of eclipse next term.

    • CAN Integration 2025

...

12V Input to 65W USB-PD Source - Electrical - WARG

12V to 24V Boost Groundside Converter - Electrical - WARG

...

 

Potential new projects

...

  • look into application notes from TI for buck/boost PCB design

Action Items

  • changing friday’s work sesh to 5-7pm

  • announcement for social

    • where to meet

    • when it is

    • what we’re doing

  • potential beginning of term order for next term → gauge readiness and amount of boards