Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Meeting times:

  • EE Meeting: Wednesdays 6 PM EST E5 2103

  • Leads Meeting: Tuesday 7 PM EST online + E7 2103

  • Various architecture syncs, timing avail on gcal

Attendance:

In person

Online

 

 

Quick Links:

Updates this week

General Intro to Electrical Team

image-20240911-125210.pngimage-20240911-125315.png

Goals For the Term

  • Bring Up Boards

    • esc can adapter x 5 (Meghan)

    • 12S Buck x3 (Ishman)

    • CAN Splitter x 5 (Daniel)

    • Single Servo Module x 5 (Daniel)

    • Keyboard x 5 (Nathan)

    • Tracking Antenna Board x 5 (Ryan)

    • 6s servo module x 5 (Meghan)

    • 6S Power Module x 5 (Andrew)

    • LED board 30.5x30.5 x 5 (Parker)

    • rpi interface rev b x3 (daniel)

    • LED board motor mount x 5 (daniel)

    • GPS breakout x 3 (Ria)

  • Design Boards

    • Will hear more about them later

    • ^ maybe just skip this for now?

  • Harness the Drones

  • Attend Flight Tests to provide support

Announcements/General updates

  • Join arch syncs to understand the system.

  • EE Hackathon Grind Session this Friday! (September 13, 7pm - September 14th, 3am)

    • Ethan Abraham Hosting!

    • EE members will grind out their projects and chill with the team.

    • It's hackathon-like sessions like these where the team makes real progress on all of their boards.

    • You should request a HTN badge to access the bay during this time.

      • See #announcements tho worst case we should be able to sneak u in the back.

  • Fill out the Team Roster: https://forms.microsoft.com/r/ka0MJHJQ9D

    • Everyone who has completed the bootcamp MUST fill it out every term

  • Meghan Dang Presentation on Monday

    • Introduction to adding components into the Altium library with a live walkthrough

  • First Team Social: Friday, September 20 @ 7 PM in E7 2409 (Second floor Ideas Clinic)

    • Joint social with Midnightsun and Orbital

    • Bring board games and baked goods!

  • First Term Flight Test: Saturday, September 21 @ 10 AM in WRESTRC

    • Pegasus 2 Maiden Flight Test

  • Work session next Sunday! (September 22)

    • Will be bringing up and testing boards

    • Jerry Tian Planning this session?

Active Projects

  • Just go around the room and see which core members are working on what projects and what the goals are for the project.

  • Not anticipating too many new members, but pairing with existing members on projects will be a great starting place!

  • Don’t worry too much about the projects already listed below.

LED Board Rev 1 (Parker)

Sensor Cluster (Michael)

ESC CAN Adapter (Meghan)

Unified Video System (Tom)

GPS CAN Adapter (Omar)

ELRS Redundant Diversity RX (Nolan)

ZP3 Flight Interface Board (Anthony, Ryan)

12S Servo Module (Jerry)

48V->12V,8V,5V @ 3A BEC (Buck Converter) (Ishman)

Tracking Antenna Controller Improvements (Ryan)

12S Power Module (Taim)

6S ESC (Rayyan, Mostafa)

Boost Converter (Allan)

Smoke Stopper (Anthony)

6S Power Module (Andrew)

  • No labels