Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Meeting times:

  • EE Meeting: Wednesdays 6 PM EST E5 2103

  • Leads Meeting: Tuesday 7 PM EST online + E7 2103

  • Various architecture syncs, timing avail on gcal

 

 

Attendance

In person

Online

 

 

 

 

Quick Links

 

 

Updates this week

Goals For the Term

  • Bring Up Boards

    • esc can adapter x 5 (Meghan)

    • 12S Buck x3 (Ishman)

    • CAN Splitter x 5 (Daniel)

    • Single Servo Module x 5 (Daniel)

    • Keyboard x 5 (Nathan)

    • Tracking Antenna Board x 5 (Ryan)

    • 6s servo module x 5 (Meghan)

    • 6S Power Module x 5 (Andrew)

    • LED board 30.5x30.5 x 5 (Parker)

    • rpi interface rev b x3 (daniel)

    • LED board motor mount x 5 (daniel)

    • GPS breakout x 3 (Ria)

  • Design Boards

    • Will hear more about them later

  • Harness the Drones

  • Attend Flight Tests to provide support

 

 

Announcements/General updates

  • Join arch syncs to understand the system.

  • Fill out the Team Roster: https://forms.microsoft.com/r/ka0MJHJQ9D

    • Everyone who has completed the bootcamp MUST fill it out every term

  • Meghan Dang Presentation on Monday

    • Introduction to adding components into the Altium library with a live walkthrough

  • First Team Social: Friday, September 20 @ 7 PM in E7 2409 (Second floor Ideas Clinic)

    • Joint social with Midnightsun and Orbital

    • Bring board games and baked goods! 

 

Active Projects

Pegasus 2

(Jerry)

 

LED Board Rev 1

(Parker)

 

 

Sensor Cluster

(Michael)

 

 

ESC CAN Adapter

(Meghan)

  • Meghan Dang

  • boards & components in (besides can circuit), probably not assembled until 28th worksesh

 

https://uwarg-docs.atlassian.net/wiki/spaces/EL/pages/2596929559/6S+Servo+Module?search_id=ef05e725-2bcc-4564-9027-46ecc31c5be8

(Meghan)

  • Meghan Dang

  • boards & components in (besides can circuit), probably not assembled until 28th worksesh

 

 

Unified Video System

(Tom)

 

 

GPS CAN Adapter

(Omar)

 

 

ELRS Redundant Diversity RX

(Nolan)

 

 

12S Servo Module

(Jerry)

 

 

48V->12V,8V,5V @ 3A BEC (Buck Converter)

(Ishman)

 

 

Tracking Antenna Controller Improvements

(Ryan)

 

 

12S Power Module

(Taim)

 

 

6S ESC

(Rayyan, Mostafa)

 

 

Boost Converter

(Allan)

 

 

Smoke Stopper

(Anthony)

 

 

6S Power Module (Andrew)

  • Andrew Chai

  • Included in early September board order, will arrive soon

  • Board arrived with board order shipment

  • Small issue with component sourcing but has since been addressed. Components should be in soon so hopefully assembly can also start in the near future

  • No labels