Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Version History

« Previous Version 2 Next »

https://uwarg-docs.atlassian.net/wiki/x/J4Bbm

Attendance

Mechanical

Notes on manufacturing status.

Airframe

Wing

landing gear

  • landing gear adapter arrived and safely stored in the red toolchest

  • Has to be assembled and mounted to the air frame

Empennage

  • horizontal and vertical stabilizers complete

  • control surfaces printed, and linkages made as well

  • Only left to glue the vertical stabilizer to the horizontal stabilizer and test the servos for control surface deflection

Servo temperature issue

Everything Mech is in last drawer in the red toolbox.

flagpoles are on 1st row on mech shelf

Avionics/EE updates

Timeline

  • Eclipse Strapdown Test: March 1st/2nd

  • Eclipse Maiden Flight Test: March 8th/9th

  • another foam plane?

Pilot Training - Foam Plane

  • No labels