๐ธ General Team Status/Schedule (inc. other subteams):
2 RFC’s coming out later today. Please leave comments & hopefully we can get them merged soon
Flight tests this weekend went ok:
EFS Bake night on the 20th @ megans place (or mine idk)
Mid-term checkins coming up soon
sign up here: /wiki/spaces/Meetings/pages/2135752735
In-Person work/help sessions
Tuesday 8-10PM
Thursday 6-7:30PM
Sunday 6-8PM
Monday 3-5PM
๐ Quick Links:
Attendance
Online:
In-Person:
๐ฅ PR’s and Reviews
๐ Updates this week!
(Updates here → see table of contents for structure)
Empty tasks:
Neo M.8
SBUS
Optical Flow sensor
Phoenix Tuning (yuchen hardy ayoung kenson)
bricked 3 nucleo boards - cannot reflash, one or two of them have smoked
ZeroPilot 3
System Manager (anni, Gordon, Aadi)
Skeleton Framework up for System Manager (in branch <>)
none of the functionality, but has the framework.
Ideally : PM/AM skeleton and/or methods ready for use. (small PR from both into master?)
Path Manager (neha)
Updated diagram and documentation on confluence
logic to go btw different states have been clarified and added
Blockers: SM ↔๏ธ PM, what does CV need in full Telem struct
Attitude Manager (anni, aidan, jack)
Jack has taken control of AM
Correcting old fixed-wing PR
AM/New_Arch almost complete - connecting a few things
Telemetry Manager (Aadi)
Telemetry manager RFC in, prototype being started.
LOS
Had a last minute LOS architecture meeting (minutes here Sunday November 6, 2022 (LOS Architecture Meeting)) to discuss how drivers and interfaces should be defined.
no more singletons (except for LOS_interfaces)
will use dependency injection
LOS thrread safe
There needs to be repo structure changes, specifically related to having individual driver params files per board package options.
May have to prematurely merge the current PRs so the repo restructuring can happen, then get people to work on it after that.
Guy Blumenthal LOS Actuators:
Did some PR changes but not a lot, got pretty busy ๐ญ
Will finish addressing current comments & implement some of the decisions made on the sunday meeting
Anthony Bertnyk LOS Telem:
Mostafa Hussein LOS Pos:
Hailey Doleweerd LOS Comms:
Christopher Chung LOS_Link :
PR is in
After LOS meeting, converted PPM driver to not be a singleton and made LOS_Link a singleton.
Systems Tooling & Infra
Infra + Devops
Simulator (SIL)
Start simulator by adding sensors and placing down relevant blocks
Created confluence page for resources on building the simulator (and learning relevant information)
Come up with more *detailed* roadmap/flow chart of simulink model
HIL (Hardware In the Loop) Controller
I2C mock interface up (needs testing)
need to “connect” mock interface with bmx driver
VN driver - SPI or UART?
Need to meet with electrical to discuss PDB sometime in future
Tracking Antenna (kevin, yuchen)
Doing research on antennas
Trying to get a rough draft done for mechanical to look at by this week
Logging
Stanley finishing SD Card driver.
Characteristic testing to determine how much current draw, scared about 150mA specification from the data sheet, but got about 60mA from testing which is within tolerance
โ Priorities next week:
TUNE Phoenix
๐ STUCK!
โ Action Items
- Christopher Chung LOS Interfaces
- Yuchen Lin Tuning done
๐ญ Things to look out for!
fw procurement order placed