🍍 Updates this week!
Cornflakes
April 2 Flight Test
https://uwarg-docs.atlassian.net/wiki/spaces/FT/pages/2207383694/Apr+02+2023+Flight+Test+WRESTRC
If anyone would like to come to the flight test we are highly likely to have vehicle space so please drop a message in Discussion Thread !!!
Icarus Wiring Diagram + Harnessing (Michael, Farris, Rayyan, Nolan, Ethan)
Ethan:
RFC created for Airside Power Architecture, discussion has begun and theres a various things that need to be changed by Rayyan and Farris
Rayyan:
Helped with filling out Power Architecture page
Work through Icarus Airside Power Architecture rfc
Farris:
Michael:
Daniel
Anni & Megan (Tech Dir & Mech Lead) will be in person Saturday morning, Allison (Mech Cornflakes) will be around in the evenings as well for discussions regarding layout stuff!
EE Onsite Work Session (Robson, Elion, Jack)
Robson: Tested and verified video transmission from camera to display screen
Jack: Started RFC for VN-300 harness design
Further notes see below:
ZeroPilot Program
Assembly & Testing (Ethan)
Lower priority due to other competition-related tasks which are more important
Admin
Purchase Orders (Ethan)
Digikey order sent out
TME connectors arrived
XT90s need to be ordered from amazon to make parallel battery harness
Bootcamp Revamp (Michael, Kevin, Farris)
No meaningful progress has been made in the past week.
We want to have this done before next term as recruitment is starting up then!
PCBs
24-12,5 Buck (Ethan, Michael)
Awaiting Digikey Order for final Zener Diode
Will assemble QTY(20) (Half and Half per variant) before competition
for use in Telem Tower: 2023-03-25 - Ground Station Vrx Power
12-5 Buck (Nolan)
Nolan Haines Not present at meeting, to add updates and timeline async
4S 30A Motor Controller (Muhammad)
Worked through most of the review items (all that's left is just laying some GND vias left)
Will plan to have another version ready for review tomorrow or Wednesday
Took some time to read up on tantalum caps vs ceramic/aluminum, will begin writing something up tomorrow
5-24V Boost (Steven)
Steven Wang Add updates and timeline
Has a board size drawn out, working on getting the rules & vias into it this week
Feedback to be given asynchronously
Daniel Puratich Added into Asana
Plan is to order JLCPCB Order all at the same time
12S Servo Module (Stanley, Michael, Rayyan)
Added most buck components to Altium, still a couple left, had to change some components due to some already being in the library / some out of stock
Stanley Hao To assign Tom Chiu to some component creation in Altium
Bootcamper Progress Updates
Robson - Finished last task; final review this week if possible
Get this done!!! :d
Hoping to get it reviewed soon!
Tom: Watching the buck converter videos and final questions left.
I made way too big of a doc for all the questions, and it’s been so long since the beginning that I’ll likely have to study before I’m tested on it. I also did it on my note-taking app, not sure if it’s as convenient to send to someone. Can I reach out at any point to request a review or to be tested?
Michael Botros to discuss in bootcamp thread
Mena: Meeting setup with Michael to review!