Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Current »

Attendance

General Updates

Reminders

Board bring up Status

Please update test plans/board documentation!

Board Name

status

blockers

plan going forward

GPS Breakout

  • where are those gps boards

need to order new GPS boards

Ria Prakash

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=e839dcd8-defc-42f1-8280-8e2c21fbeea5

Single Servo Driver

  • Buck and LDO confirmed to be working. Load and efficiency testing completed, looks good. Load transient testing in progress

  • blocked by firmware people right now ..

Load transient testing → EFS Firmware testing

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=726878aa-bcb8-4728-9eed-18483cfb5c94SingleServoDriverEfficiency.png

6s Power Module

  • Both sides assembled

  • Still needs some cleanup with connectors and AFE chips

  • Some small rework fixes but mostly good to go for firmware

  • Needs firmware for other side to do voltage and current sensing using the AFE chips

 

Peggy 2/Comp Updates

  • Jerry Tian For Peggy 2

  • Did not make progress

  • Tracking antenna, water controller on order

  • Single servo on firmware

Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

  • The below boards should be included

    • 6S servo module rev 2 - On midterm order - assembly likely next term

    • Single Servo Driver - waiting on EFS

    • 6S power module - in validation Andrew Chai for details

      • POR for first flight of eclipse next term.

    • CAN Integration 2025

General Tasks

In order of priority. These are the active design projects.

12V Input to 65W USB-PD Source - Electrical - WARG

12V to 24V Boost Groundside Converter - Electrical - WARG

 

Potential new projects

Action Items

  • No labels