Agenda

  • General updates for this week

  • Flight test

  • Reminders

  • Competition updates

  • Eclipse (fixed wing updates)

  • Project updates

Attendance

In person

Online

Ryan Scomazzon

Kenny Na

Megan Lee

Santosh Erathasari

Edson Gao

Jerry Tian

@Arnav Dalmia

Andrew Chai

@Aathithan Karunaran

@Joel Crasto

@Khalil Ramzi

Sam Zhang

Tim Gu

Ahmed Osman

General Updates

  • Work sessions

    • Tuesdays @ 6pm (sorry we missed this Tuesday)

    • Saturdays @ 3pm (#2 this week! 6S Servo assembly clean-up)

  • Start of term board order

    • Waiting on Meghan Dang to complete order, hopefully monday

    • Kenny Na to order in person with Sarah on Monday!

  • Pick&Place machine

  • Looked at DMMs, one of them is just cooked even with a new battery and one of them is hard to get at the fuse. Didn't bother swapping fuses from the dead one cause you can’t see if it is intact.

  • Tracking antenna meetings

    • Sunday 2pm

Flight Tests

  • Last flight test

    • Plan: Test Target Detect using IR camera (Picamera)

    • Cancelled due to lack of reasonable plan, non urgent timeline, and ability to add on another test

    • Will be shifted to the next flight test

Reminders

Pegasus/Competition Updates

  • Did more pump testing

  • Old pumps are garbooo - will not use

  • Tested if the new pump is bidirectional. It is not. That means we will need to buy a second one for the outlet.

  • Tested the new pump past its rated spec and works just fine.

  • This would require about 500mA from a 12V rail and can be controlled with water controller.

  • Did current analysis on the drone with Megan Lee

  • Mech is strongly considering no winch (therefore no servos) after the pump testing

    • Since we arent hanging a pump, it is less risky to leave cable dangling.

    • SSD if needed?

  • Non EE related updates

    • New airframe for tuning is here

      • This is so someone can learn how to tune the drone

      • Should be made this weekend

  • What else should be done?

    • Make more LED boards?

    • Make more SSD?

Eclipse Updates

  • Jerry Tian

  • Maiden flight electrical block diagram is done. Tim Gu is getting started on the harness design. All harness sections below need a harness diagram.

    • fuselage

    • right wing

    • left wing

    • tail

  • Fried ELRS boards?

    • Not installing an antenna while boards is powered up means that transmission line is terminated with an open circuit, wave is getting reflected back and the doubling voltage destroyed the transmitter chip 😞

Project Updates

In order of priority. These are the active design projects.

PDB Andrew Chai

  • conf doc?

    • Will be made after this meeting

  • Schedule meeting with Kenny Na Megan Lee Santosh Erathasari to discuss project

  • Initial ideas

    • Power distribution board that supplies power to most/all electronic sub-systems of the board

    • Standard connector that provides common rails: 12V, 5V

    • Really wanna optimize efficiency, maybe play around with some cool ideas with soft switching, different converter topologies etc

    • Power conversion system will take priority during inital development phase, last attempt at making this got archived due to limited bandwidth and also focus on additional features like I-Sense + RPP

BMS Andrew Chai

  • Will schedule to meet with Sam Zhang

  • Any more interest from others not present at last meeting?

  • Looking into feasibility, integration, possible components + IC’s, active vs passive balancing

RPi Interface Rev C - Electrical - WARG (atlassian.net) Kenny Na Daniel Puratich

  • On JLCPCB cart and ready to be ordered

  • Trying to order DigiKey components + parts to fix ELRS+Buck

  • Will now be ordering 1x of buck only, 1x of modem only, and 1x of modem + STM

  • 3x of the buck ICs and STM have already been ordered, so some of those will be left spare.

  • Pick & Place would be huge, this board has so many components

12S ESC - Electrical - WARG (atlassian.net) Ethan Abraham& Andrew Chai

  • Done, waiting for board order

ELRS Redundant Diversity RX - Electrical - WARG (atlassian.net)Nolan Haines

12S Pre-Charge Controller ModuleRobert Tang Kevin Li

  • is this going on board order? is it possible if we get some ppl to review ? -Meghan

3S ESC Kenny Na Santosh Erathasari Megan Lee

  • Schematic still underway

    • need to figure out sensing, STM I/O

Tracking Antenna Controller w ELRSAhmed OsmanNolan Haines

12V Input to 65W USB-PD Source - Electrical - WARG Ian Van Den Steen

12V to 24V Boost Groundside Converter - Electrical - WARG Tim Gu

  • Picked an option for a 960W 12-24V 40A convertor to buy off AliExpress for ~$100

    • Should be suitable for charging 4 x 7000mAh batteries simultaneously at 1C

  • Math and reasoning updated on the confluence page, can someone confirm it’s correct

Water System Controller rev 2 - Electrical - WARG Shawn Yang

Open Tasks

  • Peggy harnessing?

  • Replacing DMM fuze/batteries?

Action Items