Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 5 Next »

Assembly Checks

  • Verify no connector pins look soldered together
  • Verify no pins on STM32 look shorted
  • Verify pin 1 on chips aligns with indicator
  • Apply a few plug/unplug cycles on connectors to test solder joint quality

Power Testing

DMM

  • Make sure no power rails are shorted to ground or each other with DMM
  • Slowly increase voltage (with low current limit, 100mA max) on buck input, check its not drawing excessive current/power (ensure no output load)
  • Probe the output net for voltage stability with DMM
  • Slowly increase voltage on internal 5V rail and verify the internal 3.3V rail turns on (LDO functionality)

E-load

  • Perform a load test on buck converter: use an e-load to fully saturate the buck and verify you get the output current expected (up to 1A)
  • Step the load and perform efficiency calculations: 12V, 24V, 50V
  • No labels