6S Servo Module Rev. 2 Test Plan

6S Servo Module Rev. 2 Test Plan

Assembly Checks

Verify no connector pins look soldered together
Verify no pins on STM32 look shorted
Verify pin 1 on chips aligns with indicator

Power Testing

DMM

Make sure no power rails are shorted to ground or each other with DMM
Slowly increase voltage (with low current limit, 100mA max) on buck input, check its not drawing excessive current/power (ensure no output load)
Probe the output net for voltage stability with DMM
Slowly increase voltage on internal 5V rail and verify the internal 3.3V rail turns on (LDO functionality)

E-load

Perform a load test on buck converter: use an e-load to fully saturate the buck and verify you get the output current expected

Related content

Single Servo Driver Test Plan
Single Servo Driver Test Plan
More like this
6S Servo Module End User Guide
6S Servo Module End User Guide
More like this
6S Servo Module Rev 2
6S Servo Module Rev 2
More like this
12-5V Buck + ELRS RX: Test Plan
12-5V Buck + ELRS RX: Test Plan
More like this
6S Servo Module Rev 1
6S Servo Module Rev 1
More like this
2023-07-11 Servo Module 12S Meeting notes
2023-07-11 Servo Module 12S Meeting notes
More like this