Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Meeting times:

  • EE Meeting: Wednesdays 6 PM EST E5 2103

  • Leads Meeting: Tuesday 7 PM EST online + E7 2103

  • Various architecture syncs, timing avail on gcal

 

Attendance:

In person

Online

 

 

🔗 Quick Links:

🍍 Updates this week!

General Intro to Electrical Team

image-20240911-125210.png

image-20240911-125315.png

Goals For the Term

  • Bring Up Boards

    • esc can adapter x 5 (Meghan)

    • 12S Buck x3 (Ishman)

    • CAN Splitter x 5 (Daniel)

    • Single Servo Module x 5 (Daniel)

    • Keyboard x 5 (Nathan)

    • Tracking Antenna Board x 5 (Ryan)

    • 6s servo module x 5 (Meghan)

    • 6S Power Module x 5 (Andrew)

    • LED board 30.5x30.5 x 5 (Parker)

    • rpi interface rev b x3 (daniel)

    • LED board motor mount x 5 (daniel)

    • GPS breakout x 3 (Ria)

  • Design Boards

    • Will hear more about them later

  • Harness the Drones

  • Attend Flight Tests to provide support

Announcements/General updates

  • Join arch syncs (smile)

  • Work session next Sunday! (September 22)

    • Will be bringing up and testing boards

    • Jerry Tian Plan?

  • EE Hackathon Grind Session this Friday! (September 13, 7pm - 3am)

    • EE members will grind out their projects and chill with the team.

    • It's hackathon-like sessions like these where the team makes real progress on all of their boards.

    • You should request a HTN badge to access the bay during this time. See #announcements tho worst case we should be able to sneak u in the back.

  • Fill out the Team Roster: https://forms.microsoft.com/r/ka0MJHJQ9D

    • Everyone who has completed the bootcamp MUST fill it out every term

  • First Team Social: Friday, September 20 @ 7 PM in E7 2409 (Second floor Ideas Clinic)

    • Joint social with MidSun and Orbital

    • Bring board games and baked goods!

  • First Term Flight Test: Saturday, September 21 @ 10 AM in WRESTRC

    • Pegasus 2 Maiden Flight Test

Active Projects

LED Board Rev 1 (Parker)

  • Parker Lawrence-Valeriani

  • moved to rev 2, can integration, one sided PCB

  • 2 different layouts, one to accomodate 40x40 mounting, also pushing for 30.5x30.5mm layout

  • handed off 4 boards to mech so that they can be mech tested etc

Sensor Cluster (Michael)

ESC CAN Adapter (Meghan)

  • Meghan Dang

  • placement started, hopefully that + layout done end of this week/early next week

Unified Video System (Tom)

GPS CAN Adapter (Omar)

ELRS Redundant Diversity RX (Nolan)

ZP3 Flight Interface Board (Anthony, Ryan)

12S Servo Module (Jerry)

48V->12V,8V,5V @ 3A BEC (Buck Converter) (Ishman)

  • Ishman Mann

  • basically done, layout review needed

  • via clearance?

  • Nolan → review board

Tracking Antenna Controller Improvements (Ryan)

  • Ryan Scomazzon

  • Getting started with project, understanding etc

  • flowchart by tuesday next week?

12S Power Module (Taim)

6S ESC (Rayyan, Mostafa)

Boost Converter (Allan)

Smoke Stopper (Anthony)

6S Power Module (Andrew)

  • Just getting started :)

  • No labels