Comp Design Direction

Alison Thompson

  • General design changes for Peggy 2 will be added payload and angled landing gear

  • Angled landing gear will let us more accurately land centered on the barrel

  • Examining 2 payload options, working on both in parallel:

    • Simple pump design

    • More complex scoop design

Pegasus Electronics Cases

Alison Thompson

New Task:

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=454e08ee-75a1-4abb-bfce-61c30f9a9913&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055

Pegasus Frame

Alison Thompson

New Task:

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=22627f15-b937-4025-bd38-f6ec52622c1e&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055

Peggy 2 Payload

Alison Thompson

New Tasks:

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=a710ce65-866e-4683-8b81-b92913489d13&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=a226b59e-c344-4ec6-b235-5b2d9c0df8fd&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055

Tracking Antenna

Sohee Yoon

  • Planning to water jet the angle limiters this week

  • Agapa Goombs how’s the baseplate stabilizer going? Tracking Antenna Revival

    • The plate modifications are done, as well as new posts with potential bearings added to the post assemblies → concern with sizing for the waterjet plates (45 cm D but the limit is 30 cm)

    • We’ll prob need to order (or find if we have them already) ball bearings for this

Eclipse (Fixed-Wing) Airframe

Evan Janakievski

Close to being finalized.

  • Need to work on integrating the fuselage and the plan for that.

  • The motor and camera mount is being finalized by Arnav Gupta

    • Calum Chisholm, the fuselage will need a new shape as the front of the plane is being changed from the adjustment of the motor mount

  • There may be some machining tasks when this is being constructed for those interested

image-20240926-143341.png

Wings

Nathaniel Li

  • Sohee Yoon got materials ordered: balsa came in, waiting for ultracote and monokote

  • Continuing with FEA study on ribs?

  • Rib spacer progress? Sam Wong

  • Aileron progress? Sam Wong Agapa Goombs Keegan Jeewan

    • I’ll setup a meeting for us to discuss

    • We made some progress with our approach of taking the existing ribs, separating them according to the dimensions in the aileron sizing, and adding a 2-spar design. Want to take another look at the CAD on the weekend to finish up the hinges, finalize the spar dimensions/location and final assembly.

Fixed wing landing gear

Fuselage

Sohee Yoon

Ground station

Smile Khatri

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689925135?contentId=2689925135&entryId=1e2c1bb7-efdd-4156-8912-ef90fd0a2f95&savedViewId=068c945f-e934-45fe-9ace-0b0297c20e2eimage-20240926-195729.png

Next Meeting

Create from Template
spaceKeyMeetings
templateName2362999182
titleYYYY-MM-DD Mechanical Meeting Minutes
templateId2362999182
buttonLabelNew Meeting Minutes