Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

General Updates

  • Last flight test

  • Next flight test / team photo

    • Biggest flight test of this term! - great chance to see systems in action

    • Testing lots of things, see channel and conf doc for details

    • Saturday Nov 2nd

    • Pancakes @ Daniel’s 9AM - see gcal for address

    • breaking into Daniel's??

      • break into daniel’s house challenge (gone wrong)

    • Prep 10-11

    • Test 11-3

    • https://discord.com/channels/776618956638388305/1296522287985721408

    • 2024-11-02 Competition Flight Test - Flight Tests - WARG

    • What needs to be done?

      • Todays sesh?

      • Lighting board harnesses

      • ESC soldered peggy 1

        • to be done after this meeting

      • Tracking antenna ready for mobile testing (mounting, battery)

        • Coordinating with Hardy, power working

        • Power solution for IR beacons

        • plug into 3s battery (question) - test

      • Will mention things that are needed in #electrical

  • Team photo

    • Sat Nov 2nd @ 3PM after flight test - be here to be part of the photo!

  • Midterm board order

    • Original date Nov 4th, Nolan is reassessing timeline - give feedback

    • Current boards (speak up if we are missing you)

      • Tracking antenna rev 2 - Ryan

        12->5V @ 4A buck - Kenny - Daniel

        USB-C Sink - Kenny - Daniel

        24V->5V @ 5A buck - Robert - Kevin

        6S servo module rev 2 - Meghan

        Water Controller - Shawn - Daniel

        RPi interface rev C - Daniel

        Unified Video System - Tom

        Sensor Cluster - Michael -

        quadversity ELRS - Nolan

        straight can splitter - Daniel

        programming conn adapter - Meghan
        12S ESC - Andrew - Ethan not on midterm order

  • EE Knowledge Session - Validation

    • Banger session from Jerry Tian

    • Happened on Monday

    • Recording/notes posted in #electrical

  • EE Knowledge Session - MOSFET Selection

  • Comp/Eclipse sync

    • Due to Halloween, sync times have changed for this week only.

    • Comp Arch Sync Today at 8pm

    • No Eclipse sync this week

  • Please clean up after yourself

  • Consider using JLC parts in the future?

...

Meeting Times

  • Sticking with current meeting time

  • Best times were Monday at 8 and Wednesday at 6

  • One less person can make it on Wednesday but due to class timing, having you for 30 mins is better than someone missing the whole thing.

...

Board Name

status

blockers

plan going forward

Tracking antenna

  • needs a rev 2

  • will try and power using a diff board/power supply so efs can test with it

  • buck design has mistakes, needs new rev probably with diff buck IC

continue debugging and document process

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=8b156da0-b88f-4487-9034-999268a953df

LED Lighting REV3

  • completely done

Board A has issues, to be resolved in worksesh

not tested with EFS yet

all functional but one from efs testing
  • w/ firmware working (i think)

none

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=7ceadf2b-7db2-51c4-b57b-f3eb3a499404

6S Servo Module

  • needs a rev 2 due to invalid buck design

  • ordering by nov 1st

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=7f7d75da-97a5-4829-ae84-2f24de007591

GPS Breakout

  • where are those gps boards

can’t find GPS board that needs to be soldered on, ask autonomy?need to order new GPS boards

Ria Prakash

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=e839dcd8-defc-42f1-8280-8e2c21fbeea5

Single Servo Driver

  • awaiting minor rework and validation

Finished other side today during work session. Did not get to validate or fix up neopixels. Will likely be done post-midtermawaiting validation

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=726878aa-bcb8-4728-9eed-18483cfb5c94

6s Power Module

  • Finished one side of the board (Buck side)

  • Other side likely to be completed in a coming work session

  • Buck has been validated under DCM and CCM operation modes, works great in both :000

  • Needs firmware for other side to do voltage and current sensing using the AFE chips

...

  • Jerry Tian For Peggy 2

  • Analog Video System is working on the ground

  • RPi interface to be installed

    • to be done on friday’s worksesh

  • 4x LED boards to be installed

  • 1x new ESC to be installed

    • to be done after meeting by Meghan Dang unless someone else wants to do it

Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

  • The below boards should be included

...

...

12V to 24V Boost Groundside Converter - Electrical - WARG

Action Items

  • get more soldering irons (2)

    • reach out to hakko