Attendance

General Updates

  • Project manager changes

    • Kenny Na Is now a work session PM and will be organizing/running most work sessions

    • Jerry Tian Will be the eclipse PM instead.

  • Merch order

  • Work sessions SCHEDULED

  • Start of term board order

    • Waiting on ELRS redundant diversity RX

    • cutoff date this friday

    • Kenny Na to order in person with Sarah on Tuesday

  • Pick&Place machine

    • Discussed at SDC meeting, not really any new info

    • If we want it we can use it.

    • Other leads are fine with us having it in the bay

    • If we still want to set it up yeah but not really useful so just if interested

  • Co-ops? (Winter 2025 term)

    • Lowered requirements!

    • winter 2025 term co-op placements were “[awful]”, worst in history

    • 300+ engineering students in need of hire

    • accepting any creative way of getting students co-op credit

    • opening hiring wide open → 4, 5 co-op students, helping on just projects, short terms OK, flex credit possible, unpaid**, will waive in-person requirement**

    • just for this term - not a continuous effort (hopefully spring term is better.)

Flight Test

Reminders

...

  • Was testing a new pump, looks a lot better than the old one

  • We will need 12V on the drone.

    • Must check if PDB has enough current for 12V

    • If not we need a 48-12V buck

      • We have one that we made but it blew up.

        • Anyone wanna look into cap filtering?

    • Alternatively we can buy one off the shelf

    • Test 12s power?

    • High current power module? - test

  • Still need to do an analysis on if the pix can support another 1-2 Servos

Eclipse Updates

  • Jerry demoed TinyCAD for harness diagrams

    • Going off of new system diagram Jerry made

    • Harness diagram timeline early Feb., mid FebUsing the XT60 2+4 connectors. assembly

    • Does anyone want to help with the diagram? Tim Gu

  • Need to order XT60 2+4 connectors so they get here early Feb ideally

  • 24V->5V @ 5A Buck Converter Board - pretty sure finished & validated? Worth checking to fly

  • 12V -> 5V @ 4A Buck Converter + ELRS Receiver board 1 & 3 not working, board 2 link drops

    • Need to order extra SX1281 RF IC & U.FL connectors to diagnose if it was an assembly issue

      • booting up without an antenna connected may have killed LNA due to high-Z power reflection

        • there was no ESP firmware when I did this on accident after assembly, but it’s still possible…

    • Otherwise out of ideas on this one… try different antennas? 😞

    • This is just for foam plane but my pride is on the line - Kenny Na

    Redundant buck - pretty sure finished? Worth checking

Project Updates

In order of priority. These are the active design projects.

Andrew Chai - Research into new PM project?

  • Battery management system for custom drone battery packs

    • cell balancing

    • firmware required!

  • 12S Power Distribution Board

    • could be in time for VTOL 2026

    • integrate components and reduce harnessing

  • People interested

RPi Interface Rev C - Electrical - WARG (atlassian.net) Kenny Na Daniel Puratich

...

12S ESC - Electrical - WARG (atlassian.net) Ethan Abraham& Andrew Chai

  • MODAY ORDER YAYYY

ELRS Redundant Diversity RX - Electrical - WARG (atlassian.net)Nolan Haines

  • like 99% done. doing finishing touches and getting a clear DRC

  • Needs to update rules

  • Trying to get on order

12S Pre-Charge Controller ModuleRobert Tang Kevin Li

  • Needs review!!

3S ESC Kenny Na

  • Schematic almost finished - need to finish STM32 design

  • Would appreciate schematic review from anyone

    • MOSFET selection & RG value

    • Maybe start with 2.2 ohm, popular value

    • Can talk to farris

  • Layout beginning soon!

  • Estimated completion EOT W25

  • Could use some help with layout, chat in Discord!

Tracking Antenna Controller w ELRSAhmed OsmanNolan Haines

  • Osman and Nolan meeting this weekend

  • High level architecture done this or next weekend

  • Tasks not ready until next week or the week after

12V Input to 65W USB-PD Source - Electrical - WARG Ian Van Den Steen

...

  • Picked out PD arbitration IC and buck boost IC

  • starting on schematic 

12V to 24V Boost Groundside Converter - Electrical - WARG Tim Gu

  • Did some math and found a few COTS options, updated confluence page, would like someone to review if the calculations/reasoning is right

    PSU is rated for up to 480 W at 12V DC, so for maximum charging capability we would get a convertor that can handle 480 W

  • Might be able to get this for ~$50 on AliExpress

  • How fast do we care about charging the batteries? (how much power/current)

    • Which option to choose depends on PSU

  • We’re using the 12V PSUs that are currently wired to the chargers. What is the output power rating?

  • How much current do the batteries need to be charged with? Charger has 4 channels, up to 15A each

  • Jerry sent photo with details

  • Maybe design for 7Ah at 1C

  • Found some options. Will pick one soon

Water System Controller rev 2 - Electrical - WARG Shawn Yang

  • MONDAY ORDER WOOHOOO

Open Tasks

  • Peggy harnessing?

  • Pegasus current limit checking

  • Replacing DMM fuze/batteries?

...