2023-2024 Program Outline
Competition (AEAC) Related Project(s) + Breakdown
| Mech | EE | EFS | Autonomy | |
---|---|---|---|---|---|
Propulsion + Ctrl |
|
|
|
| |
| (airside) |
|
|
|
|
Sensing |
|
|
|
| |
| (airside) |
|
|
|
|
Video System |
|
|
|
| |
| (airside) |
|
|
|
|
| (groundside) |
|
|
|
|
Command & Telem |
|
|
|
| |
| (airside) |
|
|
|
|
| (groundside) |
|
|
|
|
|
|
|
|
|
|
Pegasus airframe (Airside - non subsystem specific updates) |
|
|
|
| |
Tracking Antenna (groundside - non subsystem specific updates) |
|
|
|
| |
|
|
|
|
|
|
Non-Competition Projects
Annis bright ideas!!!! | Mech | EE | EFS | Autonomy |
---|---|---|---|---|
Small/Medium Multirotor Frame Director: @Megan Spee | Build the Frame | Harnessing & Connector standardization | Software testing on-board frame | Software testing in the air |
Zeropilot 3 SW Director: @Anthony Luo | Fixed wing test vehicle (foamie) | ZP3 PCB | Software Complete |
|
Fixed Wing Frame Director: @Megan Spee | Build the Frame | (Minimal) harnessing | Software testing. |
|
Thrust Stand Director: @Megan Spee |
|
|
|
|
List Of integration-required Projects (12 total)
Annis bright ideas!!!! | Mech | EE | EFS | Autonomy |
---|---|---|---|---|
Large Quad Frame Director: @Daniel Puratich @Megan Spee @Anthony Luo | Build the frame | Harnessing & Power Architecture |
|
|
Tracking Antenna Director: @Anthony Luo @Megan Spee | Antenna Tower | Harnessing & Power Architecture | Software & Telemetry Integration |
|
Command & Control Links Director: @Anthony Luo @Daniel Puratich |
| Gemini PCBA’s | LTE Telem Integration into GCS. Other Telem radio options (xbees, rfd900s, etc. All documented and working). |
|
Sensor Integration Director: @Anthony Luo @Daniel Puratich @Megan Spee | Sensor Mounting Solutions | Harnessing | Integrate sensor into systems |
|
Small/Medium Multirotor Frame Director: @Megan Spee | Build the Frame | Harnessing & Connector standardization | Software testing on-board frame | Software testing in the air |
Comp ZP Director: @Daniel Puratich |
| ZP3 PCB’s | SBUS / Mavlink Passthrough |
|
QR Code & Machine Vision Director: @Anthony Luo |
|
| GCS Ready | Software Implemented |
Jetson Landing Pad Director: @Daniel Puratich |
|
| ZP3 Passthrough Ready | Jetson ready |
GCS Director: @Anthony Luo |
|
| COTS Solution Ready | Custom Auxilliary board ready. |
Zeropilot 3 SW Director: @Anthony Luo | Fixed wing test vehicle (foamie) | ZP3 PCB | Software Complete |
|
Power Delivery / Management boards Director: @Daniel Puratich |
| 12s Servo module, buck boost, Power Module, etc |
|
|
Fixed Wing Frame Director: @Megan Spee | Build the Frame | (Minimal) harnessing | Software testing. |
|
Thrust Stand Director: @Megan Spee |
|
|
|
|