Meeting times:
EE Meeting: Wednesdays 6 PM EST E5 2103
Various architecture syncs, timing avail on gcal
Attendance
In person | Online |
---|---|
|
|
Quick Links
Updates this week
Goals For the Term
Bring Up Boards
esc can adapter x 5 (Meghan)
12S Buck x3 (Ishman)
CAN Splitter x 5 (Daniel)
Single Servo Module x 5 (Daniel)
Keyboard x 5 (Nathan)
Tracking Antenna Board x 5 (Ryan)
6s servo module x 5 (Meghan)
6S Power Module x 5 (Andrew)
LED board 30.5x30.5 x 5 (Parker)
rpi interface rev b x3 (daniel)
LED board motor mount x 5 (daniel)
GPS breakout x 3 (Ria)
Design Boards
Will hear more about them later
Harness the Drones
Attend Flight Tests to provide support
Announcements/General updates
Join arch syncs to understand the system.
Fill out the Team Roster: https://forms.microsoft.com/r/ka0MJHJQ9D
Everyone who has completed the bootcamp MUST fill it out every term
Meghan Dang Presentation on Monday
Introduction to adding components into the Altium library with a live walkthrough
First Team Social: Friday, September 20 @ 7 PM in E7 2409 (Second floor Ideas Clinic)
Joint social with Midnightsun and Orbital
Bring board games and baked goods!
Active Projects
Pegasus 2
(Jerry)
Waiting for new Range Finder
Flight Test this weekend 2024-09-21 Pegasus 2 Maiden Flight
(Parker)
(Michael)
(Meghan)
boards & components in (besides can circuit), probably not assembled until 28th worksesh
(Meghan)
boards & components in (besides can circuit), probably not assembled until 28th worksesh
(Tom)
(Omar)
(Nolan)
(Jerry)
48V->12V,8V,5V @ 3A BEC (Buck Converter)
(Ishman)
Waiting for order arrival
Tracking Antenna Controller Improvements
(Ryan)
On board order from early September, will arrive soon
(Taim)
(Ethan)
Firmware control algorithm confirmed
Using AM32 open source sinusiodal control, with DSHOT communication supported
STM32 FOC functionality will be supported hardware-wise as a back-up
MCU pinout finalized. Will be transferring over to Confluence soon so that others/EFS members can have a look but it should be good
Will be wrapping up schematic changes by next meeting. I will make a thread in ee-12s-esc to begin a review.
(Rayyan, Mostafa)
(Allan)
(Anthony)
6S Power Module (Andrew)
Included in early September board order, will arrive soon
Board arrived with board order shipment
Small issue with component sourcing but has since been addressed. Components should be in soon so hopefully assembly can also start in the near future