IMACS Case

 

Big Project

Project

Project Manager

Big Project

Project

Project Manager

IMACS Groundstation

IMACS Frame

@ project manager

Project Description

General context for this project and a list of initial hardware requirements are in .

The mechanical team is responsible for organizing the layout of the monitor, keyboard, ports, etc. The control system will be built into a Nanuk 930 case. Some components may need to be manufactured, such as mounts for switches, ports, lights…

image-20240626-033859.png
Example

 

 

 

Constraints

Constraints

Written By

Append Date

Constraints

Written By

Append Date

Built into Nanuk 930 case

Smile

 

Fit a 6S battery or a few?

Daniel

 

supports ground station arch as outlined in the 2025 doc

Daniel

 

Use the 19” monitor that has been disassembled. It should be mounted in the top of the case as far back as possible to leave room for components on the bottom half when closed. Allow the VGA and Power cables to exit the top and enter the bottom half of the case. Make it look nice, cover the space around the monitor with polycarbonate.

Nathan Green

2024-09-10

Relevant Contacts

Subteam

Contact

Contact Description

Subteam

Contact

Contact Description

Tech dir

@Nathan Green

  • Answering hardware questions

Exec dir

@Daniel Puratich

  • Ask questions regarding electrical stuff

Assignees

Assignee

Asana Task

Date

Assignee

Asana Task

Date

@Calum Chisholm

 

link to asana task assigned

Date assigned

Task Progression/Updates

Calum: @ 2024/07/10

Created CAD model of Nanuk 930 Case based on website dimensions. The dimensions are quite vague and this is a rough idea to work off off.

Created plates from given drawings that will attach to the bottom and top of the case with #6 X 1/2" Hi-Lo Self-Tapping Sheet Metal Screws (18pcs) per plate. The case has premade threads.

 

Calum: @ 2024/07/17

Would like to know the dimensions and sizing of components so I can CAD them out and arrange them

image-20240717-223035.png