Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Date

Attendance

Team Announcements

Item

Presenter

Notes

Next Flight Test

Smile Khatri

Saturday at 10am - Autonomy Houston test and Peggy 2 Range + Speed test, join the flight test thread and add your name to the doc if you want to go!

https://discord.com/channels/776618956638388305/1283890207287935018

Next Work Session

  • Saturday at 11am!

  • Looking at scoop design prototype

  • CAD work

  • For bootcampers, you can come to work sessions for help with your bootcamp

Other Announcements

Alison Thompson

  • We have decided we will be competing in AEAC this year, please read conops:

  • Plz fill out team roster form for this term! Mandatory for joining the team, complete this AFTER your bootcamp! We will NOT assign you any tasks, give you the bay code, or review your designs until this is done!

Updates

Item

Presenter

Notes

Comp Design Direction

Alison Thompson

  • General design changes for Peggy 2 will be added payload and angled landing gear

  • Angled landing gear will let us more accurately land centered on the barrel

  • Examining 2 payload options, working on both in parallel:

    • Simple pump design

    • More complex scoop design

Pegasus Electronics Cases

Alison Thompson

New Task:

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=454e08ee-75a1-4abb-bfce-61c30f9a9913&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055

Pegasus Frame

Alison Thompson

New Task:

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=22627f15-b937-4025-bd38-f6ec52622c1e&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055

Peggy 2 Payload

Alison Thompson

New Tasks:

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=a710ce65-866e-4683-8b81-b92913489d13&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=a226b59e-c344-4ec6-b235-5b2d9c0df8fd&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055

Tracking Antenna

Sohee Yoon

  • Planning to water jet the angle limiters this week

  • Agapa Goombs how’s the baseplate stabilizer going? Tracking Antenna Revival

    • The plate modifications are done, as well as new posts with potential bearings added to the post assemblies → concern with sizing for the waterjet plates (45 cm D but the limit is 30 cm)

    • We’ll prob need to order (or find if we have them already) ball bearings for this

Eclipse (Fixed-Wing) Airframe

Evan Janakievski

Close to being finalized.

  • Need to work on integrating the fuselage and the plan for that.

  • The motor and camera mount is being finalized

    • Calum Chisholm, the fuselage will need a new shape as the front of the plane is being changed from the adjustment of the motor mount

  • There may be some machining tasks when this is being constructed

image-20240926-143341.png

Wings

Nathaniel Li

  • Sohee Yoon got materials ordered: balsa came in, waiting for ultracote and monokote

  • Continuing with FEA study on ribs?

  • Rib spacer progress? Sam Wong

  • Aileron progress? Sam Wong Agapa Goombs Keegan Jeewan

    • I’ll setup a meeting for us to discuss

    • We made some progress with our approach of taking the existing ribs, separating them according to the dimensions in the aileron sizing, and adding a 2-spar design. Want to take another look at the CAD on the weekend to finish up the hinges, finalize the spar dimensions/location and final assembly.

Empennage

Fixed wing landing gear

Fuselage

Sohee Yoon

Next Meeting

  • No labels