Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Current »

Attendance

General Updates

  • Last flight test

  • Next flight test / team photo

    • Biggest flight test of this term! - great chance to see systems in action

    • Testing lots of things, see channel and conf doc for details

    • Saturday Nov 2nd

    • Pancakes @ Daniel’s 9AM - see gcal for address

    • breaking into Daniel's??

      • break into daniel’s house challenge (gone wrong)

    • Prep 10-11

    • Test 11-3

    • https://discord.com/channels/776618956638388305/1296522287985721408

    • 2024-11-02 Competition Flight Test - Flight Tests - WARG

    • What needs to be done?

      • Todays sesh?

      • Lighting board harnesses

      • ESC soldered peggy 1

        • to be done after this meeting

      • Tracking antenna ready for mobile testing (mounting, battery)

        • Coordinating with Hardy, power working

        • Power solution for IR beacons

        • plug into 3s battery (question) - test

      • Will mention things that are needed in #electrical

  • Team photo

    • Sat Nov 2nd @ 3PM after flight test - be here to be part of the photo!

  • Midterm board order

    • Original date Nov 4th, Nolan is reassessing timeline - give feedback

    • Current boards (speak up if we are missing you)

      • Tracking antenna rev 2 - Ryan

        12->5V @ 4A buck - Kenny - Daniel

        USB-C Sink - Kenny - Daniel

        24V->5V @ 5A buck - Robert - Kevin

        6S servo module rev 2 - Meghan

        Water Controller - Shawn - Daniel

        RPi interface rev C - Daniel

        Unified Video System - Tom

        Sensor Cluster - Michael -

        quadversity ELRS - Nolan

        straight can splitter - Daniel

        programming conn adapter - Meghan
        12S ESC - Andrew - Ethan not on midterm order

  • EE Knowledge Session - Validation

    • Banger session from Jerry Tian

    • Happened on Monday

    • Recording/notes posted in #electrical

  • EE Knowledge Session - MOSFET Selection

  • Comp/Eclipse sync

    • Due to Halloween, sync times have changed for this week only.

    • Comp Arch Sync Today at 8pm

    • No Eclipse sync this week

  • Please clean up after yourself

  • Consider using JLC parts in the future?

Reminders

Meeting Times

  • Sticking with current meeting time

  • Best times were Monday at 8 and Wednesday at 6

  • One less person can make it on Wednesday but due to class timing, having you for 30 mins is better than someone missing the whole thing.

New Lead Selection

  • Thanks to everyone who filled out the nomination form (smile)

  • Your next lead will be… Meghan Dang (congrats)

  • Not effective immediately

Board bring up Status

Please update test plans/board documentation!

Board Name

status

blockers

plan going forward

Tracking antenna

  • needs a rev 2

  • will try and power using a diff board/power supply so efs can test with it

  • buck design has mistakes, needs new rev probably with diff buck IC

continue debugging and document process

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=8b156da0-b88f-4487-9034-999268a953df

LED Lighting REV3

  • completely done w/ firmware working (i think)

none

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=7ceadf2b-7db2-51c4-b57b-f3eb3a499404

6S Servo Module

  • needs a rev 2 due to invalid buck design

  • ordering by nov 1st

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=7f7d75da-97a5-4829-ae84-2f24de007591

GPS Breakout

  • where are those gps boards

need to order new GPS boards

Ria Prakash

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=e839dcd8-defc-42f1-8280-8e2c21fbeea5

Single Servo Driver

  • awaiting minor rework and validation

awaiting validation

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=726878aa-bcb8-4728-9eed-18483cfb5c94

6s Power Module

  • Finished one side of the board (Buck side)

  • Other side likely to be completed in a coming work session

  • Buck has been validated under DCM and CCM operation modes, works great in both :000

  • Needs firmware for other side to do voltage and current sensing using the AFE chips

Peggy 2/Comp Updates

  • Jerry Tian For Peggy 2

  • Analog Video System is working on the ground

  • RPi interface to be installed

    • to be done on friday’s worksesh

  • 4x LED boards to be installed

  • 1x new ESC to be installed

    • to be done after meeting by Meghan Dang unless someone else wants to do it

Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

  • The below boards should be included

Bootcamp Updates

  • Keep sending questions to your respective threads!

General Tasks

In order of priority. These are the active design projects.

Potential new projects

12V Input to 65W USB-PD Source - Electrical - WARG

12V to 24V Boost Groundside Converter - Electrical - WARG

Action Items

  • get more soldering irons (2)

    • reach out to hakko

  • No labels