May 6th, 2023, Icarus as a Quad

Make sure to update the Title following the format “Jan 01, 2020 Flight Test”

 Flight Preparation

Requested by:

Comp Team

Requested Date

May 6, 2023

Location and Time

CED Alma, QC

Summary & Goals

Test Icarus as a quad

Approved?

Yes

 Required Persons During Test

Name

Phone #

Role

Reason

Name

Phone #

Role

Reason

Anthony Luo

 

Pilot in Command

  • Aircraft preparation

  • Filling out documentation

Megan Spee

 

Secondary Pilot & mech

 

Aidan Bowers

 

Flight Engineer

 

Nathan Green

 

Flightline personnel

 

Conall Kingshott

 

Mech

 

Ethan Abraham

 

Electrical

 

Morning of // arrival

Start battery charging:
all 6s
5s for video tower
controller batteries
groundstation laptop battery
goggle batteries
Telemetry / Video towers assembled
Populate flight test box:
extension cables for laptop
wrenches
allen keys (M5 & M3)
pliers
knives
tape
velcro/zip ties
Battery harness
6s batteries
USB-C cable
Battery tester
Props
DMM
Check airframe wiring
Flight Modes

1-hr before flight window

Mission briefing (roles, responsibilities, goals, etc). @9
Flight test box populated & batteries all fully charged
Check sensor health
CG Check with batteries
Props on.
Motor / prop direction check
Control rods/horns intact
Landing gear healthy
Flight line equipment
flight test box
controller box
2 controllers w/tracer
video box
annis hardcase
telem / video towers
wings (plugs in place temporarily)
Water
WALK OUT TO FLIGHTLINE WITH EVERYTHING GG

Pre-Flight checklist

Flight Window checklist

 

 

 

Pre-Departure Checklist

Pre-flight Safety Checklist

Post-Flight Checklist

Item

Owner

Item

Owner

ALL MEMBERS PRESENT

 

 

Flight Test Post Mortem

RCA for Red Items

Create a RCA and keep it as a child page.

Action Items

Other Resources

Booking WRESTRC Field

WRESTRC