  • Review of 2024-05-07 EE Architecture

  • What are we working on right now?

  • What projects before comp?

  • What projects after comp?

  • What kind of support is needed?

  • See below run down of all project

  • What kind of support is needed?

    • Harnessing

      • we don’t know how to advertise this

    • ee leads add more thoughts here?

Projects

  • BEC

    • todo

      • on routing right now

      • design, test, etc.

    • use case

      • all future vehicles

    • why

      • for reducing the number of power supplies we have on the drone right now

      • simplify all the power harnessing we have

    • who

      • Ishman

    • when

      • Spring 2024 → design

      • Fall 2024 → bringup, flight test end of term

  • Next Gen PDB (Spring 2024, Fall 2024)

    • todo

      • new pdb

    • why

      • replace off the shelf

    • use case

      • pegasus size

    • timeline

      • no efs lift

      • high risk

      • never

  • Smoke Stoppers

    • todo

      • cheaper than COTS efuse board

    • use case

      • ground validation

    • why

    • who

    • timeline

      • no efs lift

      • deprioritize for now

  • Sensor Cluster (Spring 2024, Fall 2024)

    • todo

      • design board with sensors and a CAN node

    • use case

      • future vehicles

      • want for competition

    • why

      • CAN node for minimal harnessing connection of a lot of sensors to the FC

      • we commonly use these sensors

    • who

      • michael botros

    • timeline

      • Spring 2024 → design

      • Fall 2024 → test, bringup

  • ESC CAN Adapter (Spring 2024, Fall 2024)

    • todo

      • design

    • use case

      • future vehicles

    • why

      • CAN node for minimal harnessing connection to the FC

      • we need to space out ESCs on larger aircrafts

    • who

      • Meghan Dang

    • timeline

      • this term

  • ELRS Gemini Next rev todo

    • todo

      • add buck input stage

      • make the board smaller

    • use case

      • for competition

    • why

      • improved rf link quality

      • doesn't exist commercially

    • who

      • pending assignment

      • running out of people

      • low priority, odes nothing for EFS

    • timeline

      • Spring 2024 → design

      • Fall 2024 → bringup

  • LED Controller PCB

    • todo

      • assemble and use

    • use case

      • for realism points for competition and cool ig posts

      • pegasus

      • future vehicles

    • who

      • Parker

    • timeline

      • rush before competition

      • reasses new features

  • ZeroPilot 3.0 Hardware (ZP3HW)

    • todo

      • assemble flight interface board (just assembly)

      • fix oscillator on primary (do not redo design)

    • use case

      • for EFS M2 and beyond ZPSW objectives

      • never be competition viable

    • who

      • unassigned

    • timeline

      • save for fall 2024

  • Tracking Antenna (Bring up S24)

    • why

      • for reducing harness count on the antenna head

    • todo

      • combine nathan’s and Michael’s board?

      • best of both worlds

      • needs way to send mavlink wireless

      • needs compass on pcb

      • cheaper arduino

      • fix led (remove LL shifter, use FET or diode)

      • possible power electronics

    • use case

      • comp

    • timeline

      • low priority

  • Servo Module 12S

    • todo

    • use case

      • future plane or vtol

    • why

      • for spacing out servos

      • minimizing wire complexity on upcoming airframes

      • more stable power to far away servos

    • who

      • unknown

    • timeline

      • we should make this high priority for VTOL

  • ELRS Quadversity

    • todo

      • design

      • test

      • make smaller

      • some efs stuff?

    • use case

      • all future vehicles

    • why

      • improved rf link over gemini

    • who

      • Nolan Haines

    • timeline

      • design end of term

  • GPS CAN Adapter (S24, F24)

    • todo

      • make GPS’s work with CAN

      • we could buy gps ones that support it

      • are we capable of doing this sub 20 bucks per board

        • 5 per PCB, 7 per micro, 4 can transciever, 2 ldo

      • big EFS lift

    • use case

      • all future vehicles

    • why

      • allows us to space them more without SI concerns

      • busability

    • who

      • New bootcamper (Omar)

    • timeline

      • S24 design

  • Unified Video System

    • todo

      • make video system sit on one panel

        • osd, vtx, mux, possible power supply, just house connectors

      • all one board

    • use case

      • all future vehicles

      • competition air vehicles

    • why

      • improves packaging

      • reduces harnesses

      • reduces emi problems

      • save space

    • timeline

      • Spring 2025 start

      • lower priorty bc no efs

    • who

      • unknown

  • 24V-12V @ 2A Buck Converter Board

    • todo

      • none

    • use case

      • for ground validation

      • unlikely to be competition viable

    • why

      • fun

  • 12V-5V @ 3A Buck Converter Board

  • High Current Power Module (Done, Spring 2024)

    • todo

      • bringup

      • test

      • test at flight test

    • use case

      • maybe viable for competition

      • needs to offer some improvement on COTS to be viable

      • validate and test our copy of the COTs for now

      • plan for the future here, we need to think of exactly what functionality we want and what’s achievable.

    • why

      • fun

      • might beat COTS (prove plz)

    • timeline

      • unknown

  • Zeropilot 4.0 Hardware (ZP4HW)

    • todo

      • design

    • use case

      • future competition vehicles

    • why

      • for some integration improvement in the future

    • timeline

      • unknown way far out

  • 4S 30A BLDC Motor Controller

    • todo

      • unknown

    • why

      • for fun

      • never be competition viable

    • timeline

      • none

  • 5V USB - 24V @0.25A Boost Converter

    • use case

      • for ground validation

    • who

      • assigned

    • timeline

      • fall 2024 finish, very unknown

  • 4S2P Higher Current Output PDB Board

    • use case

      • for future vehicles i guess but we dont have any vehicles of this size planned

    • who

      • Tom

    • timeline

      • unknown

  • 12S ESC

    • why

      • never be competition viable

      • for fun

    • timeline

      • never

  • 6S ESC

    • use case

      • houston

    • why

      • never be competition viable

      • for fun

    • who

      • assigned

    • timeline

      • low priority, could deprioritized

      • no progress recently

  • Drone Power Routing Board

    • lots of integration overhead

    • who

      • would need to have someone ambitious, shouldnt be pursued for now

    • timeline

      • never no resources