/
2024-04-22 Battery Information

2024-04-22 Battery Information

Summary

  • @Omar El-Sawy Driving progress

    • Led by @Nolan Haines

  • Four batteries locked in by technical director, placement one per side as drawn below.

Technical Details/Changelog

Schematic to Follow:

 

Screenshot 2024-05-20 at 5.22.20 PM.png

 

Screenshot 2024-05-17 at 4.58.23 PM.png

Layout:

Things TODO

do not delete any of these todos until approved by eelead

Arch doc implementation Info

  • Diagrams to be merged in likely after competition

Approvals & Reviews

< space for reviewers to leave thoughts / approvals? >

Name

Approve/Deny?

Reason

Name

Approve/Deny?

Reason

 @Nathan Green

 

 

@Nolan Haines

 

 

Related content

System Integration LED Controller into Pegasus
System Integration LED Controller into Pegasus
Read with this
2024-01-22: RFC Battery configuration
2024-01-22: RFC Battery configuration
More like this
2024-05-16 Electrical Director Sync
2024-05-16 Electrical Director Sync
Read with this
2023-05-25 EE Meeting
2023-05-25 EE Meeting
More like this
Cell Monitor
Cell Monitor
Read with this
2024-03-21 EE Meeting
2024-03-21 EE Meeting
More like this