/
2024-10-03 Mechanical Meeting Minutes

2024-10-03 Mechanical Meeting Minutes

Date

Oct 3, 2024

Attendance

@Sohee Yoon

@Alison Thompson

@Georgia Westerlund

@Evan Janakievski

@Camilo Artigas Alos

@Megan Spee

@Ben Lovegrove

@Keegan Jeewan

@Sam Wong

@Nathaniel Li

@Thushanth Parameswaran

@Smile Khatri

@Jievan Tapajna

@Victor Sun

 

Team Announcements

Item

Presenter

Notes

Item

Presenter

Notes

Next Flight Test

@Smile Khatri

Saturday at 10am (leaving at 10, show up before) - Autonomy Houston test and Peggy 2 test, join the flight test thread and add your name to the doc if you want to go!

Next Work Session

 

  • Saturday at 11am!

  • CAD work

  • For bootcampers, you can come to work sessions for help with your bootcamp

Other Announcements

@Alison Thompson

  • We have decided we will be competing in AEAC this year, please read conops:

  • Plz fill out team roster form for this term! Mandatory for joining the team, complete this AFTER your bootcamp! We will NOT assign you any tasks, give you the bay code, or review your designs until this is done!

    • Microsoft Forms

Updates

Item

Presenter

Notes

Item

Presenter

Notes

Comp Design

@Alison Thompson

Eclipse (Fixed-Wing) Airframe

@Evan Janakievski

  • Frame is almost complete, some last adjustments needing to be made

  • Motor mount is needing review

  • Will order parts from EMS soon

New Tasks!

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690252803?entryId=6fb8deec-abae-40d0-8c6d-f99d7a1bcaae

 

Watarrow consultation

@Smile Khatri

  • Chatted w/ Watarrow members about wing constructions. Key points summarized below:

    • Moving away from monokote heat shrink wrap

      • Time consuming to manufacture

      • Decent amount of concaving w/ 1/16th ribs

      • Used non-CSA approved iron. The play might be to use team funds to procure it.

        • might use team funds

        • ask watarrow abt their iron and borrow it for the first run

    • 3D printed leading edge could be a problem - the ironing process could require about 200 deg C, which will probably melt/deform the 3D prints. Another option is to buy a bar of wood and CNC it to the shape.

      • another option is to not heat the leading edge, use glue instead

      • foam would still deform

      • make a small test piece w/ 3 ribs

Tracking Antenna

@Sohee Yoon

  • Angle Limiter update: Currently the resized angle limiter is being manufactured, and I’ll check it tomorrow (when it is finished)

Fuselage

@Sohee Yoon

  • @Calum Chisholm any updates on the new fuselage shape? Fuselage Design

  • How are we attaching the fuselage to the airframe?

Landing Gear

@Ben Lovegrove

  • Landing gear is progressing well Fixed wing landing gear

  • The front landing gear needs to be optimized for weight still which I will complete by the end of the weekend

    • The rear landing gear is nearly done, the hardware is all designed but I need to check the specs for the servo. I will also have this done by the end of the weekend.

Horizontal stabilizer

@Thushanth Parameswaran

image-20241003-233208.png

 

Rough Design. Will be using Heat film, 3D printed leading Edge. Green marked area is where servo for elevator control will be placed

Wings

@Nathaniel Li

  • @Sohee Yoon and i to run new FEA on ribs this week

  • Aileron progress is going well

    • @Agapa Goombs @Keegan Jeewan @Sam Wong working on 2 different designs

    • Will sync again when CAD is ready

  • Ribs spacer are done, good work @Sam Wong

  • New tasks coming soon for pitot tube mounting and GPS mounting

Work sessions

@Alison Thompson

  • Pls show up to work session

Next Meeting

Related content

2024-09-26 Mechanical Meeting Minutes
2024-09-26 Mechanical Meeting Minutes
More like this
2024-10-10 Mechanical Meeting Minutes
2024-10-10 Mechanical Meeting Minutes
Read with this
2024-11-07 Mechanical Meeting Minutes
2024-11-07 Mechanical Meeting Minutes
More like this
Fuselage Design
Fuselage Design
Read with this
2024-09-19 Mechanical Meeting Minutes
2024-09-19 Mechanical Meeting Minutes
More like this
2024-10-03 Competition Architecture Sync
2024-10-03 Competition Architecture Sync
Read with this