2025-03-27 Mechanical Meeting Minutes

2025-03-27 Mechanical Meeting Minutes

Attendance

@Gabriel Singaraja

@Rohaan Vasa

@Christopher Arzoumanian

@Alison Thompson

@Evan Janakievski

@Calum Chisholm

@Khalil Ramzi

@Nathaniel Li

@Smile Khatri

@Sohee Yoon

@Victoria Gee

Team Announcements

Item

Presenter

Notes

Item

Presenter

Notes

Next Flight Test

 

Tomorrow

Weather doesn’t look promising

Bay cleanliness

 

  • Please put away tools after using them and put items back to where they belong, either on the shelf or main table. Main table should be reserved for Peggy 1, 2, other drones, and Eclipse wings. The third table should be kept clear for other subteam work sessions

Mech Leadership Planning

@Alison Thompson

Purchase Protocol

@Alison Thompson

  • Purchase protocol important notes

 

 

 

 

https://uwarg-docs.atlassian.net/wiki/x/1gDHlQ?atlOrigin=eyJpIjoiMDZkZDYzMTZlZDNhNDBjYTlmNDIwNGUwOTgyOTQyMWUiLCJwIjoiYyJ9

Updates

Item

Presenter

Notes

Item

Presenter

Notes

Eclipse frame stuff

 

Good vibes

Eclipse Landing gear

@Rohaan Vasa

  • Rohaan finished up the rear landing gear

    • It is at a new height now, we have a much larger angle of attack for take off now. this comes from the need for a tail dragger to have a high angle of attack for takeoff and landing

    • There will be a risk of that connection to the servo breaking on landing

      • Should be good after the modification made, as the new angle offers a possibility to land on front landing gear first

    • Ideally we have a smaller wheel for the rear landing gear

Eclipse Wings

@Rohaan Vasa @Gabriel Singaraja

  • Harnessed and now wrapped

  • The harness went through the end of the box-tube which was not the original plan, so we had to take some material off the box-tube so the connector had room when mounted

  • Was the servo zero position fixed?

    • Servos were tested and are now properly set

    • Holes are patched

  • Wings are tensioned

  • Ailerons need filing/sanding to not rub against rib

Comp Payload

@Khalil Ramzi

  • Tank is finalized and ready for comp. Once printed, we'll add pieces of o-ring in the additional channels that were added around the bolt holes to prevent warping.

  • Double pump mount is in progress, with the first iteration done. Now have to make mounting bolts more accessible.

Thermoforming Project

@Divit Gawri

@Christopher Arzoumanian

  • Any updates?

  • Got the adapter designed

  • Possibly at a slot for O-ring

  • Will try to get printed today or tomorrow

Carbon fiber panels

@Evan Janakievski

@Christopher Arzoumanian I can show you these after the meeting

Hot wire cutter

@Rohaan Vasa

Has been looking into it

Will populate decision/research doc with more information in days to come

@Smile Khatri to add into too

Related content