2023-10-07 Houston Missions
Make sure to update the Title following the format “Jan 01, 2020 Flight Test”
Flight Preparation
Requested by: | |
---|---|
Required Sub-team integration efforts | Mech Electrical EFS CV Operation Sys-Int |
Date of Request | Jan 25, 2023 |
Location and Time | |
Goal Summary |
|
Approved? | Yes / Pending / No |
Mandatory Attendees
Name | Phone # | Role | Reason |
---|---|---|---|
|
| Flight Test Lead |
|
|
| Pilot in Command |
|
|
| Safety |
|
|
| (Subsystems integration, Secondary pilot, etc) |
|
Auxilliary Attendees
Name | Role |
---|---|
|
|
|
|
Drivers & Seat Arrangement
Driver | Vehicle Type | Passenger |
---|---|---|
|
|
|
|
|
|
|
|
|
Goals/Objectives
Objective(s) | Priority | Owner(s) |
---|---|---|
Test Geolocation Module |
| Autonomy |
Test QR Scanner & Waypoint Upload |
| Autonomy |
|
|
|
Flight Test Timeline
Date/Time | Action |
---|---|
0X00 | Briefing @ WARG Bay |
0X00 | Arrival at Flight Test Location |
0X00 | Flight Test Operation #1…… (eg: Capturing data, tuning, etc) |
| Flight Test Operation #2 |
| Flight Test Operation #…….N |
0X00 | Debrief |
|
|
|
|
Incident Procedures
Incident | Location | Procedure |
---|---|---|
Crash | WRESTRC |
|
< otherwise > |
| |
Flyaway |
| Outline the procedure for flyaways. List relevant contact information for local authorities and plans of action to recover control of the aircraft |
Fire | WRESTRC |
|
< otherwise > |
| |
Injury |
|
|
Property Damage |
|
|
Week-Before To-Do List
Day-Before To-Do List
Pre-Departure Checklist
Pre-flight Safety Checklist
Post-Flight Checklist
Item | Owner |
---|---|
ALL MEMBERS PRESENT | |
| |
|
Flight Test Debrief
Flight Test Timeline
Analytics (hopefully applicable)
Flight Test Post Mortem // Final Thoughts // Condensed Summary
RCA for Red Items
Create a RCA and keep it as a child page.
Action Items
Other Resources
Booking WRESTRC Field