Mechanical 2023-2024 Goals

Comp Projects

  • Tracking antenna (OTS)

  • Comp frame

Non-Comp Projects

  • Tracking antenna (custom)

  • Houston re-design

  • Thrust testing rig

Tracking Antenna : OTS/Custom

end goal : have a working tracking antenna that integrates with mavlink out from mission planner.

  • Has telescoping arm for height.

  • Has yaw/pitch control.

Priorities

  • Custom solution (1-axis, low cost, low resolution) by mid summer.

    • Updated Jul8 to be target: End of summer. Plan is in place?

  • Can iterate on it in following terms prior to comp

integration painers

  • Jul 8: Lots of difficulties getting up to speed (reading a list of stuff, without knowing what stuff does, is rough).

  • EFS / EE have been talked to about requirements. Not much more integration stuff. Only gemini board remains.

    • extra parts in separate bin.

  •  

Milestones / Check-INs

Goals:

  • mid s23 term End of S23 term: one axis low cost low resolution

  • Jan/Feb 24 - full version complete (telescoping flexible - may not be happening).

Check-ins:

  • July 8th (mid summer s23):

    • Arjun working on rotation - progress is ok. Can be mounted on tripod.

      • antennas can be removed for transport.

    • Divet? working on telescoping arm - unsure on state.

    • No spend yet, been salvaging parts.

    • End cost:

      • if 3d print parts, then one servo

      • if gearbox, cost ~ 200 ish. For YAW only.

    • Hardware looking good.

Houston Re-Design : 12” props and more payload capacity

end goal : make houston overall lighter, and allow for greater payload (jetson, rpi, etc)

Priorities

  • Mid size testing frame, smaller than vanny larger than houston is ideal. However, may be too much to do and eat into budget

    • can use vanny and houston instead? both aren’t quite suited

    • ideally we get this in summer so controls-experienced members can lead a lot of the integration and testing

    • the cost of making this whole new thing probably doesn’t make it worth it to use

    • fairly low priority, can cope with vanny and houston

    • can mod houston to make it more weight efficient

      • different lighter legs

      • extra plate to add things to at bottom

integration painers

  • Difficulty understanding requirements of items and the functionality of those items.

    • hung up on lidar for a while

  •  

Milestones / Check-INs

Goals:

  • End of term for re-design

  • May make more parts if destroyed - no plans to design new test drone(s)

    • need to work on integrating new parts.

Check-INs

  • July 8:

    • Being worked on by merek?

    • Existing parts lighter, still adding parts.

      • total weight may

    • Double check mounting for all items that may need to go on?

 

Comp Frame : Next gen airframe

end goal : make 3/4 comp airframes & have info on how to maintain them.

Priorities

  • Cost Analysis

  • Build 2 identical airframes by comp.

  • Build 1 specced airframe for comp.

2 frames at the same time - can focus on one frame this term and get the replacement parts made in fall. run 2 frames in parallel so there is a replacement

integration painers

  • Sensor integration

    • lots of change on whether stuff is going on main plate or arm or landing gears (stuff still moving).

    • ^ tried delegating, difficulty understanding / getting done.

      • difficulty getting information (not understanding exactly what needs to happen, and so not going to do it).

Milestones / Check-INs

Goals:

  • End of S23 term:

    • 1 specced airframe

  • F23 term:

    • two identical frames + replacements/upgrades?

    • unsure about mech presence on-site.

Check-Ins:

  • July 8th:

    • Baseframe is done design-wise

    • tubes are in the bay

    • Making parallel parts in parallel (i.e. plates)

    • tried delegating sensor mounts

      • Brick: lidar, opflow, fpv cams,

    • Motors + Props in

 

 

Milestones

Spring 2023

Fall 2023

Winter 2024