Notes

Last flight test

 

Upcoming Team Events

 

  • Setting up Houston flight controller - 11am Saturday

Other Announcements

 

Updates

Item

Presenter

Notes

Item

Presenter

Notes

3D printing

 

Weatherproofing

 

  • Divit working on the cad - fixing draft angles

  • PC sourcing

    • ~1.5mm thickness

    • 24 in x 48 in ~ $20

Electronic Cases

 

  • EP2

  • VTX

    • changed prototyped dimensions

    • yet to test the new print

  • IMACS

    • @Collin Tan to work with @Calum Chisholm on this project

  • CV mount

    • due end of next week

Tasks

 

  • EE started wiring Peggy 2 today. Mech’s responsible for assembling the frame, ensuring all components are secured w mounts.

  • X-frame is assembled

    • landing gear to be attached

    • need to make extra landing gears

    • motors to be mounted

  • Pixhawk mount

    • Manufacture a mount for Pixhawk flight controller, can copy existing mount from Pegasus 1

Mech Work Session - LettuceMeet

Pegasus arm clamping block discussion

 

image-20240710-223921.png
  • is the 4th bolt loose?

    • if its tight then something sus

  • lock washer

    • mis-used - try lock washer

      • split: fully compressed - don’t apply axial force.

      • might just vibrate out

      • will probably just delay the bolt loosening process, but not prevent it

    • loctite a concern

    • nylock?

  • how much benefit are we getting out of clamping blocks?

    • we believed vibe was the issue a long time ago

  • only on the clamping blocks

  • didn’t vibrate out of peek standoffs?

Fixed Wing Calculator

 

Frame

 

  • 1 tube b/w fuselage and empennage

  • nose mounts onto the frame

Next Meetin