2024-11-13 Electrical Meeting
Attendance
In person | Online |
---|---|
@Ryan Scomazzon @Meghan Dang @Ian Van Den Steen @Kenny Na @Shawn Yang @Andrew Chai @Tim Gu @Ethan Abraham @Kevin Li @Jerry Tian | @Robert Tang @Parker Lawrence-Valeriani @Michael Botros |
General Updates
Last flight test
Canceled from rain
Rescheduled to this saturday - Nov 16th
This weeks flight test
Original (canceled) flight test thread Discord - Group Chat That’s All Fun & Games
This weeks: Discord - Group Chat That’s All Fun & Games
Goals:
Test new camera, geolocation
Acquire image data for autonomy
Test tracking antenna (which didn’t work in the previous flight test attempt)
Potentially object detection testing
Midterm board order
WENT OUT WOOOHOOOOO 🎉🎉🎉🎉🎉🎉🎉GOOD WORK EVERYONE
Bit of a hold up with one board but we chillin
REMAINING ACTION ITEMS
Please follow post ordering backup processAltium Folder Structure & EE Project Backups | Post Ordering
Please prepare a Digikey list with all components needed still and put in Midterm PCB order channel Discord - Group Chat That’s All Fun & Games
everyone should come to friday’s worksesh to work on this together
Please follow this guide to complete your orderDigikey Orders
If you need stuff from Digikey, now is the time to speak up so we can throw it on this order
@Ria Prakash GPS?
Feedback on the process?
be more clear with deadlines and due dates
more frequent check-ins on boards that are part of the order
Current boards
Tracking antenna rev 2 - Ryan
12->5V @ 4A buck - Kenny - Daniel
USB-C Sink - Kenny - Daniel
24V->5V @ 5A buck - Robert - Kevin
6S servo module rev 2 - Ian - Meghan
Water Controller - Shawn - Daniel
Unified Video System - Tom
Sensor Cluster - Michael -
straight can splitter - Daniel
programming conn adapter - Meghan
Led controller rev 4
EE Workseshes - PMS Fill in
Todays (Wed Nov 13th)
creating harnessing and wiring RPi on Peggy 2
Friday’s (Nov 15th)
high current module stuff ?
digikey ordering - grind this out
Farris and Kevin's knowledge sessions.
Farris posted a video and Kevin did/will do slides. Find these in #Electrical
Farris did it on FETs and Kevin on Bucks
EE Social - @Meghan Dang for details
Rat soup and games - Meghan's place - Friday @ 7pm
not real rats (maybe)
everyone meetup @ work sesh on friday! moved from 5-7pm to line up with social
Comp/Eclipse sync
No eclipse sync.
Comp sync tmrw night (Thursday) @ 8pm
Request from Mech - Don’t use gorilla tape on the drone. Use zip ties instead.
Reminders
Please clean up after yourself
Get the electronsite role if on site - reach out to @Ryan Scomazzon if you have issues
Check out Conops for AEAC! Get involved in comp syncs for discussion National Annual UAS Student Competition - Aerial Evolution Association of Canada
If you are on a project and can use some help, reach out
Don’t forget to fill out the team roster: Microsoft Forms
Missing GPS
probably gonna order
Board bring up Status
Please update test plans/board documentation!
Board Name | status | blockers | plan going forward |
---|---|---|---|
GPS Breakout |
| need to order new GPS boards @Ria Prakash | |
Single Servo Driver |
| Load transient testing → EFS Firmware testing | |
6s Power Module |
|
|
|
Peggy 2/Comp Updates
@Jerry Tian For Peggy 2
Did not make progress
Tracking antenna, water controller on order
Single servo on firmware
This week working on pi harness
Giving out to pi rev c people
make harness schem on tinycad
Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)
The below boards should be included
6S servo module rev 2 - On midterm order - assembly likely next term
Single Servo Driver - waiting on EFS
6S power module - in validation @Andrew Chai for details
POR for first flight of eclipse next term.
General Tasks
In order of priority. These are the active design projects.
RPi Interface Rev C - Electrical - WARG (atlassian.net)
@Daniel Puratich Project Manager, Principle Hardware Engineer
@Siddharth Muralikrishnan @Anthony Lazar @Anthony Luo @Shawn Yang
Update: Handing off layout to @Kenny Na !! Goal is done end of term
End of term target
12S ESC - Electrical - WARG (atlassian.net)
@Ethan Abraham Individual Contributor
Knowledge transfer done with @Andrew Chai
Did initial placement for MCU + Power + Gate Driver
Will need to put more thought into FETs - most likely will require some cooling system since most FETs on Digikey within a reasonable price will not be able to handle the operation conditions at ambient temp
Will consult with Kevin and Ethan regarding further steps and some feedback on initial placement
End of term target
ELRS Redundant Diversity RX - Electrical - WARG (atlassian.net)
@Nolan Haines Individual Contributor
layout is like 95% done, doing silkscreen and the final touches
Fixed wing connector research (VBat, CAN, 5V)
@Ryan Scomazzon
No progress - feel free to help ouy
ELRS Gemini Testing/Rev 2
@Ahmed Osman
12V Input to 65W USB-PD Source - Electrical - WARG
@Ian Van Den Steen interested
good to start soon
12V to 24V Boost Groundside Converter - Electrical - WARG
@Tim Gu interested
look into application notes from TI for buck/boost PCB design
Action Items
changing friday’s work sesh to 5-7pm
announcement for social
where to meet
when it is
what we’re doing
potential beginning of term order for next term → gauge readiness and amount of boards