2024-10-02 Electrical Meeting

2024-10-02 Electrical Meeting

Attendance

In person

Online

In person

Online

@Ahmed Osman

@Ryan Scomazzon

@Yuchen Lin

@Jerry Tian

@Meghan Dang

@Andrew Chai

@Shawn Yang

@Tim Gu

@Kenny Na

@Ethan Abraham

@Robert Tang

@Sam Zhang

@Maxwell Lou

@Georgia Westerlund

@Tom Chiu

@Michael Botros

@Nathan Green

General Updates

  • New faculty advisor: Brandon DeHart

    • Manager of the RoboHub, and will be attending some of our competition syncs this term to provide technical guidance.

    • Derek Wright was too busy

  • Last flight test

    • Speed/Range/Obstacle avoidance

    • Did not test everything due to rain but some retune was done (needs more work)

    • Autonomy data collected

    • buck converter for RPi usb c port broke off

      • was untested

      • known issue with these board with respect to poor solder

  • Next flight test

  • Hotplate ordered - Order procurement sent out for hot plate, will be ordered imminently

  • Toaster oven not acquired yet - if you would like to help let me know

  • Get the electronsite role if on site - reach out to @Ryan Scomazzon if you have issues

  • Can someone return the bmo5 connectors to Sarah’s office (E5 2104) - Andrew

  • Midterm board order coming up @Nolan Haines .

  • Hot air gun broken - prob fixable?

    • If not see if we can get sponsored for a new one lol

    • Not blowing hot air??????

Reminders

 

Meeting Times

Board bring up Status

Please update test plans/board documentation!

Board Name

status

blockers

plan going forward

Board Name

status

blockers

plan going forward

Tracking antenna

assembled SMT components on 2 boards

  1. vin-gnd 200 ohm resistance issue

  2. fix shorted pins on the other pcb

continue debugging and document process

ESC CAN

Assembled SMT components on all 5 boards

Resoldered some components that did not reflow well/had some minor issues (mainly the STM32)

Validated continuity + potential shorts, no perceivable issues so far

Added BM06 Connectors

EFS did some initial testing with the board (with more to come) and MCU is talking and working at the moment.

Waiting for EFS to do comprehensive test to ensure full functionality - needed for all 5 boards with only one being tested currently

Support EFS with anything needed/required on EE side of things

LED Lighting REV3

Assembled 1 side (MCU + CAN circuitry)

Cleanup on STM32’s done earlier today during work session - no issues on validation side so far

Need NEOPIXELS to come in for the other side of the board

Wait for NEOPIXELS to come in ~2 weeks then assemble the other side

6S Servo Module

Assembled SMT components except for Neopixel for 1x 6s Servo board

no neopixel

rework stm

 

GPS Breakout

Assembled

can’t find GPS board that needs to be soldered on, ask autonomy?

Single Servo Driver

not started

 

Bring-up Tasks

In order of priority.

  • CAN DSHOT Controller

  • Tracking Ant Controller

    • https://uwarg-docs.atlassian.net/wiki/x/CQA7ow

    • PRIORITY ASAP

      • EFS person bust so we have bought a little time

    • Issue with buck IC

      • Enable pin not working?

      • QFN package causing issues

      • LDO into Buck is working - subsequent systems not working

      • More debugging to come

    • Maybe a short?

    • More testing today, feel free to come!

  • RPi Interface Rev B

  • Peggy 2 Lighting Board Rev 3

    • https://uwarg-docs.atlassian.net/wiki/x/BYAzow

    • validate CAN circuit with CAN DSHOT Controller before assembling this

    • let’s assemble the bottom side this weekend?

    • other side need to wait for LCSC order

    • Daniel will participate in session for sure but would be nice if someone here to PM

  • Single Servo Module

  • 6S Servo Module

    • 6S Servo Module Test Plan

    • for fixed wing, assemble before midterms

    • Saw small power trace in schematic, tested and it seems fine. Might be worth another rev?

    • Can bring up with what we have

      • conclusion

        • bring up one, test with EFS

        • fix layout, order with midterm board order

  • 12S Servo Module - Electrical - WARG (atlassian.net)

    • @Jerry Tian

    • On hold to focus on comp critical Peggy 2 tasks.

Peggy 2/Comp Updates

 

Fixed Wing Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

Bootcamp Updates

  • Continue to pop off and ask questions in your bootcamp thread

General Tasks

In order of priority. These are the active design projects.

 

Potential new project: Standard connectors fixed wing

  • VBat, CAN, 5V in one connector

  • Easily have everything together so it is easy to remove parts

Potential new project: Test Automation

  • Needs Assessment (comparing to the manual test procedure we have rn):

    • 1. characterize our custom buck converter’s performance.

    • 2. understand our designs more, help ee members learn

      • Load transient test is helpful on identifying issues if downstream board is brownout during flight test

      • Knowing efficiency of the bucks

    • 3. efs running out of work to do

  • Jerry’s is too busy to work on this rn, will be on hold until he is more free

Action Items

@Jerry Tian will try to fix hot air gun, if not successful, he will write email to hakko for help