Timeline

(I’ll move it to a calendar but it’s just dates for right now)

Date

General

Wings

Fuselage

Controls

Boom

Date

General

Wings

Fuselage

Controls

Boom

May 18

 

Airframe outline in SolidWorks

 

Plan for controls (what can be grouped together, number of servos)

Rough CAD

May 25

 

 

 

 

 

June 1

 

Wings in SolidWorks based on how they will be manufactured (redo simulations with more detail)

Start fuselage design and how everything will connect

Plan for how controls will attach (rough CAD)

 

June 8

 

 

 

 

 

June 15

 

 

Have a fuselage done that other features can attach to

Controls added to wings

 

June 22

 

 

 

 

 

June 29

Design Review (have everything in one assembly, roughly connected)

 

 

 

 

July 6

Implemented design review changes

 

 

 

 

July 13

 

 

Plan for how electronics will sit (would be nice to have 3D printed/slots for everything)

 

 

July 20

 

 

 

 

 

July 27

 

 

 

 

 

Aug 3

 

 

 

 

 

Aug 10

Final Assembly of Plane

 

 

 

 

Aug 17

Manufacturing Plan → list of all materials we’ll need

 

 

 

 

Aug 24

Order all necessary materials