2023-06-29 EE Meeting
General Team Status/Schedule:
Meeting times:
EE Meeting: Thursdays 7-8 PM EST E5 2103
Leads Meeting: Thursdays 9-10 PM EST E5 2103
Attendance:
In Person | Online |
---|---|
|
|
Updates this week!
Admin
Altium licenses are back! (Thank you Ethan!!!)
Work session on Saturday for ZP3 Primary and Interface assembly (11AM)
New project for overall electrical system architecture design
Active PCB Projects
High Current Power Module (Zen, Chris)
Zen: Calculations for 12V buck on confluence 12S Power Module
Chris J: Working on 5V buck. Some researching and picking components.
12S ESC (Ethan, Chris)
Able to generate code with STM FOC FW framework.
Component selection will be finalized for July 2
6S ESC (Mena, Rayyan)
Using previously bought MCU, current sense IC, buck IC, and gate driver IC
Need to continue sourcing passive components
Need to continue sourcing power MOSFETs
LED Controller (Bennett)
ELRS Gemini (Michael, Farris)
Farris:
Made a bunch of schematic symbols for the major components, started some basic wiring between ICs
Michael:
Made schematic symbols for E28 module, started wiring for E28, LDOs and connectors
PDB (Tom, Matthew)
Researching phase
Adding research to confluence
Tracking Antenna (Nolan, Hardy)
switch back to nucleo l5 again, because f401 at bay are all broken
started brain storming, wrote a doc for that
12S Servo Module (Stanley)
Remade buck schematic, now it should look nicer
Fixed some labelling and placement issues in the other schematics
Next: Source bigger current sense resistor, make/find diode footprint, look into mystery RC snubber on “lower” MOSFET (datasheet has it drawn in the examples but never mentions anything about it)
OSD (Neel, Jerry)
Jerry: Created a simple structure diagram On Screen Display
Bootcamper Progress Updates
Parker