07-10-2023 Meeting Minutes
Attendees
In Person
Ayoung
Hardy
Yuchen
Stanley Tang
Alex
Liang
Â
Virtual
Tom
Chris
Fola
Aadi
Roni
Mckale
Gagan
Mostafa
Neha
Pratyush
Sava
Sung-Eun
Taim
Tony
Yarema
Douglas
Aidan
Adam
Le Kang
Â
Â
General Note:
Milestone 1 completion pushed to July 21st.
System Manager
If PWM (already merged in), Sbus, and model configuration get merged, Gagan will start to combine them together.
Attitude manager
In review
Global static variable for the controller input: the code is polished, in review by Aidan. Needs discussion about the testing strategies.
Configuration is blocking the project.
Model Configuration
Issues found with initialization in the current design, Tony will be working to fix it.
Hard to say how much work is left at the current point.
SD Card Driver
Sensor Fusion
PR merged, task complete, it won’t be implemented in ZP3 immediately.
Altimeter
Document ready, up in the confluence. The link will be up soon.
Range Finder support
Preparing to test on the nucleo he bought himself.
Confusion with sequencing
Path Manager
PM processing flight and waypoints: Started Unit Test, and started researching the loiter hover features.
Telemetry Manager
Progress in Mavlink library and transmit function.
Projected to be done in August
Testing is projected to be held at the end of July
Aadi’s comment about mavlink messages:
queues between managers- can send different messages? TM-specific data to PM, take Mavlink messages, reformat them, and send them to whatever manager they need to. Need pre-defined struct for it.
Simulator
Came up with the workflow for the simulator (how it’s going to work)
Broken up the modules so everyone can sign up with a block they want to work on.
Tracking Antenna
Instead of PID tracking, we are planning to do simpler tracking.
Servos support up to 8 turns. needs calibration code for future iteration testing- Nolan will continue working on PID tracking because we will use continuous DC motors.
SBUS
Waiting for the review, ready to be merged.
Â
Â
Â
Â