Attendance

  • @Daniel Puratich

  • @Alison Thompson

  • @Georgia Vachon Westerlund

  • @Evan Janakievski

  • @Ben Lovegrove

  • @Tochi Okoro

  • @Andrew Chai

  • @Smile Khatri

  • @Meghan Dang

  • @Sohee Yoon

  • @Tong Zhang

  • @Maxwell Lou

  • @Kenny Na

  • @Agapa Goombs

  • @Sam Zhang

  • @Megan Spee

  • @Vibhinn Gautam

  • @Hardy Yu

Electrical

  • Tracking Antenna Controller

    • found root cause why the buck chip doesn’t work

      • our schematic

    • applied a fix, but buck still doesn’t power up

    • to unblock efs, we are gonna solder the seeduino & display on a brand new board, and inject 5V at buck Vout to provide power

      • timeline unknown

    • @Andrew Chai to follow up with @Ryan Scomazzon

      • how to unblock EFS now

      • Path toward descoping complex features and ordering November 1st

        • Kenny is up to do this if no ee bandwidth - @Daniel Puratich down to PM here

  • Video System

  • Lighting Board Rev 3

    • 4x boards have all been validated and handed off to EFS

    • done on ee board assembly side

    • needs firmware then will get mounted

    • would be nice to get it on the drone for a photoshoot after midterm or wait for payload

  • RPi Board Rev B

    • @Daniel Puratich completed bringup, integration, and testing last week validated fully with autonomy team

    • 2x boards, one for Houston, one for Pegasus 2 are ready

    • One on Houston is fully installed, but both are fully validated and identical

    • simple board, absolute winning on this one

    • maybe need to order more of those headers

    • @Daniel Puratich covered

Embedded Flight Software

Mechanical

Autonomy

  • What is IR Camera POR?

    • @Mihir Gupta ordered 3 Raspberry Pi IR Cameras

    • These are ordered so that we have something to test with

    • We can purchase other cameras if needed but these are intended as a starting point for now

  • What is task 2 autonomy plan?

    • @Maxwell Lou to loop back next meeting

  • Geolocation Testing plans

  • Email to follow up with Teledyne to be sent out tomorrow morning.

    • draft in there

    • just tell them path forward

Flight Tests

  • Small Quad 2025

    • for discerning between Houston and Dallas

  • didn’t test anything last weekend

    • how we plan on doing things in the future to get better!

    • review the FT doc

  • Upcoming FT before midterms

  • Right After Midterms

  • walk through the Asana to plan tests for the rest of the term

    • None over midterms week for sure

  • Future Pilots

    • need stream stuff to line up otherwise testing during winter will be really hard

    • for eclipse started convo here but need someone to step up for peggy

Comp Organizer Questions

  • Will we get a known location GPS beacon?

  • Can the 3 meter requirement be relaxed?

  • What sensors and at what times will the locations of the IR beacons be determined by the organizers?