2023-11-28 AEAC 2024 Sync

Introduction

  • Alison

  • Anni

  • Arjun

  • Arunav

  • Ayoung

  • Conall

  • Daniel

  • Georgia

  • Jerry

  • Mihir

  • Michael

  • Megan

  • Nathan

  • Tong

  • Yuchen

  • Xierumeng

  • @Anthony Luo @Daniel Puratich

  • Registration Complted

  • Next deadline is phase one paper

Systems

  • @Conall Kingshott @Nathan Green @Jonathan Di Giorgio

  • When the drone legs were put back on, we had significant issues with insufficient slack.

    • Part of it is wires were through the wrong holes, but the wires are very tight

    • it makes assembling and disassembling the arms very difficult as is

    • arms have bolts through a flange piece that were compressing the connectors

      • shown in picture below

      • extended connectors will allow us to pull the connectors clear of that

  • @Mena Azab is working on this from an EE perspective, looking to make wires from ESCs to MT30s longer

    • Getting wire order going here and then work session on assembly coming up!

  • Connectors were also getting pressed into by bolts. Should be relieved by the above

     

  • @Alison Thompson @Evan Janakievski @Georgia Vachon Westerlund

  • We’re going to be reusing old layups we already had for the floors and side panels

  • Did front and back panel layups Sunday

  • Shout out to whoever wrote this, I appreciate you

    • common teamwork W

  • I am going to send DXFs to be cut on router to Graeme and find out where to leave layups to be cut

    • label which pieces are for which