2024-11-06 Electrical Meeting
Attendance
In person | Online |
---|---|
@Ryan Scomazzon @Meghan Dang @Andrew Chai @Tim Gu @Jerry Tian @Taim Al-Dabbagh @Ian Van Den Steen @Michael Botros @Ahmed Osman @Kenny Na @Shawn Yang | @Parker Lawrence-Valeriani @Tom Chiu |
General Updates
Last flight test
Was extremely successful
We were able to test a lot of things on 3 different airframes
harnessing on Peggy 2 worky
tracking antenna ee-side worky
not able to test with dallas, but not an ee issue
big dubs
Auto data was kinda messed up and efs couldnt get tracking antenna working
Team photo
now up on the website!
Midterm board order
Now Nov 11th (Original date was Nov 4th) @Nolan Haines
Current boards (speak up if we are missing you)
Tracking antenna rev 2 - Ryan
12->5V @ 4A buck - Kenny - Daniel
USB-C Sink - Kenny - Daniel
24V->5V @ 5A buck - Robert - Kevin
6S servo module rev 2 - Ian - Meghan
Water Controller - Shawn - Daniel
RPi interface rev C - Daniel
Unified Video System - Tom
Sensor Cluster - Michael -
quadversity ELRS - Nolan
straight can splitter - Daniel
programming conn adapter - Meghan
Led controller rev 4
EE Wednesday Worksesh replaced with a review sesh
reviewed
Unified VTX
Water Controller
Buck w/ELRS
Programming Conn Adapter
Friday Worksesh
RPi mounting on peggy 2 possibly @Jerry Tian
Sunday Worksesh
TBD
no more bringup tasks really
could do an altium sesh - let us know
EE Knowledge Session - MOSFET Selection
Hosted by @Farris Matar
November 7th @6pm (tmrw)
come!
EE Social
escape room
baking
game night
tentatively set for nov 15th
Comp/Eclipse sync
Eclipse sync tonight @ 8pm
Comp sync tmrw night @ 8pm
Consider using JLC parts in the future?
Look at preferred parts
Basic & Preferred Electronic Components | JLCPCB Assembly Parts Library
Can use LCSC but costs more so try to avoid
@Nolan Haines @Kenny Na to fill this in
this convo explains more Discord - Group Chat That’s All Fun & Games
can select to place or DNP a component
would need the designer to replace components with JLC compatible ones
will take time.
making a WARG account for JLC
WEEF presentation done - went well
Reminders
Please clean up after yourself
make sure that after bringup, all the boards and components are back in their boxes! don’t want to lose any
Get the electronsite role if on site - reach out to @Ryan Scomazzon if you have issues
Check out Conops for AEAC! Get involved in comp syncs for discussion National Annual UAS Student Competition - Aerial Evolution Association of Canada
If you are on a project and can use some help, reach out
Toaster oven not acquired yet - if you would like to help let me know
check facebook marketplace there’s like 40 million https://www.facebook.com/marketplace/112763262068685/search/?query=toaster%20oven
Don’t forget to fill out the team roster: Microsoft Forms
Missing GPS
probably gonna order
Board bring up Status
Please update test plans/board documentation!
Board Name | status | blockers | plan going forward |
---|---|---|---|
GPS Breakout |
| need to order new GPS boards @Ria Prakash | |
Single Servo Driver |
| Load transient testing → EFS Firmware testing | |
6s Power Module |
|
|
|
Peggy 2/Comp Updates
@Jerry Tian For Peggy 2
LED Harness works well! Thank you everyone for helping out!
next step is to install Rpi, harness schematic design will come next Tuesday, assembly the day after
POR is to use one of either Single Servo or Water controller
LEDs on and lookin fire
Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)
The below boards should be included
6S servo module rev 2
Single Servo Driver
6S power module
Bootcamp Updates
Keep sending questions to your respective threads!
General Tasks
In order of priority. These are the active design projects.
RPi Interface Rev C - Electrical - WARG (atlassian.net)
@Daniel Puratich Project Manager, Principle Hardware Engineer
@Siddharth Muralikrishnan @Anthony Lazar @Anthony Luo @Shawn Yang
not on midterm order
descoping this project
12V -> 5V @ 4A Buck Converter + ELRS Board - Electrical - WARG (atlassian.net)
@Kenny Na Engineer
@Daniel Puratich PM
All done :)
USB-C Sink - Electrical - WARG (atlassian.net)
@Kenny Na
Done :)
24V->5V @ 5 A Buck Converter Board - Electrical - WARG (atlassian.net)
@Robert TangEngineer
@Kevin Li PM
Done :)
Unified Video System - Electrical - WARG (atlassian.net)
@Tom Chiu Individual Contributor
reviewed today
minor fixes from comments, but will be done and ready for board order
12S ESC - Electrical - WARG (atlassian.net)
@Ethan Abraham Individual Contributor
Knowledge transfer done with @Andrew Chai
Placement in progress, will have done by Friday
2-3 weeks from completion (estimate)
ELRS Redundant Diversity RX - Electrical - WARG (atlassian.net)
@Nolan Haines Individual Contributor
Sensor Cluster - Electrical - WARG (atlassian.net)
@Michael Botros
Placement finished. Stackup mostly definined. Most of signal routed. Just need to make power planes/polygons.
Considering impedance controlling SPI lines for >10MHz data speeds. Maybe just tune source resistor when board comes back instead of controlling line impedance → decided to just tune the resistor
Need to check if length matching is necessary → time difference between currently routed SPI is < 30ps, not applicable for a few 10s of MHz
@Meghan Dang Individual Contributor
@Ian Van Den Steen for buck design and layout
buck design and layout finished
starting on placement and layout with new buck and new MCU pinout
will need a few more days for this. delaying for later date (nov 11th)
(Rev 2) Tracking Antenna Controller Improvements (M3) - Electrical - WARG
@Ryan Scomazzon
Ready for review
Added flyback, switched current lim IC, swapped buck
@Ian Van Den Steen please verify it has the most recent design of your buck
Fixed wing connector research (VBat, CAN, 5V)
@Ryan Scomazzon
No progress
ELRS Gemini Testing/Rev 2
@Ahmed Osman
Water System Controller - Electrical - WARG
@Daniel Puratich PM
@Shawn Yang Engineering
reviewed in today’s sesh
minor comment fixes for layout
Straight CAN splitter
@Daniel Puratich
done :)
@Meghan Dang
reviewed in today’s sesh
done and gerbers in soon
LED Board Rev 4 - Electrical - WARG
@Parker Lawrence-Valeriani
Cleanup is done
Adding side emitting LEDs to make the drone more visible
Potential new projects
12V Input to 65W USB-PD Source - Electrical - WARG
@Ian Van Den Steen interested
12V to 24V Boost Groundside Converter - Electrical - WARG
@Tim Gu interested