2024-05-16 Electrical Director Sync
Preferred Required Attendees
@Daniel Puratich
@Nathan Green
@Michael Botros
@Nolan Haines
@Jerry Tian ← ten minutes late
@Neel Patel
Missing Attendees
@Neel Patel
@Michael Botros
We need to select preferred STM and CAN transceiver to support this new architecture push.
copy pix can transceiver
CMC preferred by Daniel
We want to use this on upcoming fixed wing aircraft after comp we need to start pounding away at it especially so EFS is able to start dev work.
See 2024-05-10 Mechanical Director Sync for post comp airframe plans
Ranking all projects discussed in 2024-05-09 Electrical Director Sync in terms of priority (highest is first)
Servo Module Improvements target boards with CAN tested end of term. Communicate w/ Jerry abt this. Make sure he’s on this, good with it, etc, get it moving ASAP. Jery won’t have time for this. Anthony?
target boards end of term. Make sure Michael understands that we want this done end of term. Probably put people on
target boards end of term, Daniel’s co-op
target boards end of term. Tom is on this. Will communicate that we have a time limit.
target boards end of next term, Nolan on this. CAN support first rev should be in addition to normal serial
target boards end of next term, Omar is on it, committed
target bringup complete for comp & change form factor for new airframe end of next term. next rev with CAN. sovle mechanical packaging. must have JSTs for next rev.
maintain for comp, further additions can be saved for a few terms from now. might have people to make smaller.
assemble for EFS M2, no more design work
could add in more improvements to design for a few terms from now. follow ardupilot stuff. combine best of both worlds and ardu support
Ishman is on it, almost done
start small build up, may have resources
leave where it is
for fun co-op is on
assemble and test, need to bringup
might’ve already been started, could reallocate efforts
let finish, use as learning
100% not this stop
100% not this stop
not being worked on
100% not this stop
is being worked on, theyre on layout, let this finish? scary, worth thinking about here, momentum, continue for knowledge
100% not this stop
Before Competition Efforts:
get the lighting system working for photoshoot
Parker and Omar are here, system design help is needed here
Nolan won’t be here for this. Maybe Monday
Get nice battery harnesses going
@Ishman Mann @Omar El-Sawy
this is a spare harness set
Portable VTX
@Nathan Green to assemble this on Saturday
Ping in @Ishman Mann to watch this to see.
Bootcamp changes?
what do you guys want to do here?
get ready for fall, that’s the risk, will sync after comp
have a system level portion of bootcamp?
it’s a lot of stuff for new bootcampers to tell them the whole system
need a way to ease members into
How do we ensure all our aircraft get system level block diagrams?
Nathan lead high level diagrams. EE assign people for lower level diagrams.
We need this to support integration and onboarding
Ideally we start to standardize more common architecture for our projects?
will be very different from quad to plane
@Nathan Green to schedule post comp system level sync
would be massive meeting
we figure everything out ahead of time.
What kind of director support is needed?
@Nolan Haines to setup EE leads syncs to get it goin