Pegasus 2

  • Make arm holes near the center larger and assembly it

  • Center assembly has been loctite

  • Will absolutely try my best to make more landing gears b4 comp (depends on mech team involvement and schedule)

    • plz hand off the second piece of stock to Ryan in ESMS ASAP, it will take some time for the alum to be done

  • Are we flying peggy 1 or 2 for comp most likely? idk what the status on wiring/when it will be ready to test

    • peggy 1 but we want peggy 2 gear

    • full systems check must be done after EE changes

      • motor direction

Antenna Tracker

  • Needs a spacer before this is can be software tested

  • I need to be given a run down of the tracker design rn, where the problem is and where to add the spacer - @Smile Khatri

  • I CADed the spacer, just forgot to make drawing/ask for it to be made, will do after this meeting - @Alison Thompson

    • we cannot test at flight test this weekend bc we don’t have material

Misc Cases

  • Gemini case is DONE LETS GOO. Sat down with the EFS leads and mounted the board yesterday.

    • fans are there