Pegasus 2

  • Assembly

    • Wiring harness is complete for high power system

    • Smaller subsystems not yet wired or mounted (Raspberry Pi, Video)

    • Sensors are mounted (optflow, rangefinder, compass)

    • Assembly is in a state where the drone can be flown on Saturday

  • Mech updates (@Alison Thompson )

    • Improving clamping blocks to have heatsets pulled out less - not critical, will update when these are done as we will have to slightly disassemble to install

    • Working on new PDB case

    • Waterproofing discussion → we have a design for a ~400g polycarb dome, I think this is not worth bc we can transport less water, looking at pursuing latex only when needed waterproofing for top electronics

  • Configuration

    • Parameters are copied from Pegasus 1 completed

    • Failsafes need checking

    • opflow needs calibration

    • Lidar needs setting up

    • Controller may need configuration changes

    • Need to run accel, gyro, compass calibrations before flight (can do this on Saturday)

  • Comms

    • MAVLink over ELRS is working, but has a limited bitrate (~13kbit/s)

    • Future of comms architecture discussion?

Antenna Tracker

  • Updates

  • Mech (@Sohee Yoon / @Alison Thompson )

    • Need to have a discussion abt what changes we want to make here

      • Last term, we updated the base plate (hole placement and inc. length on one side), shortened the spacer rod, and made the antenna holders fit better

      • Currently, working on the antenna angle limiter, and possibly placement of heat set inserts (push in from the inner face), and other updates (?)

    • My (Alison) current thoughts is to get this version working and make a new one with whatever big improvements we want based on that

      • @Sohee Yoon do you know what needs to happen to have this version operational?

    • Improvement ideas:

      • how it mounts to tripod

  • EFS

    • firmware dev is all done by @Roni Kant

    • Looking to delegate the firmware integration test to someone this week

  • EE

    • Parts not here yet, if we cant assemble the Tracking Antenna Controller by this weekend it will be first priority for next.

Ground Station

  • IMACS

    • Monitor mount in progress - aim to finish by end of next week

    • Is all hardware finalized? Can we start manufacturing the bottom plate that holds the switches?

AEAC vs SUAS

  • AEAC is locked in for this comp cycle because of CONOPS release times

AEAC CONOPS