03/08/22

Sub team

Update

Todo

Sub team

Update

Todo

Frame

  • square frame for carbon fiber

  • remake proper frame for holes to be mountable

  • mounting holes almost done

  • flat arms design by this week

    • assemble to current prototype and try flight test 2

Landing Gear

  • feet warped but mounted anyway

  • landing gear went well at flight test

  • 58cm ID barrel

  • look into a frame landing gear?

Grabber

  • claw machine concept in the works

  • look into adding theraband to design

Gimbal

  • holes are covered

  • slight design changes, reprint needed

General

  • flashforge in bay is warping prints

  • flight test!

    • grabber was not tested

    • need to coordinate with electrical to test this

    • videos to be posted via google drive link

    • have gimbal for next time

  • reflective tape for directional indication

  • How well can we hover for depositing into barrel?

  • determine max weight carriable by drone during next flight test

    • mini flight test?

    • Shrinjay or Andy

      • have someone from mech there