2024-05-25 Competition Notes

  • Purpose

    • notes by Daniel Puratich to ensure we don’t miss anything for tomorrow for task 2

    • timeline is already in gcal and agreed upon

    • not a real meeting just not sure where to put this in confluence lol

  • Related Docs

  • Flight Line Roles Task #2

    • Nathan - pilot, lte ground side setup

    • Yuchen - gso and lte for walkout, serving nathan, holding second monitor

    • Daniel - walkout, callouts, coordinating with judges, will be in gso for takeoff

    • Smile - walkout and cabin, holding the monitor for tong

    • Tong - holding video relay

  • Delegations

    • Aidan and Nathan to update failsafes

    • Yuchen on charging batteries

    • Nathan to ensure LTE video functionality

  • Notes

    • Bring monitor for video to display there

    • We must display our GPS location on one screen always

    • we should test lte video in morning

    • we are packing the cargo for ballast

      • we autotuned with it and less wind impact if heavier

    • latest conops: https://www.aerialevolution.ca/wp-content/uploads/2024/04/2024-AEAC-Competition-RFP-v1.2-14-March-2024.pdf

    • general conops:

    • callsign

      • pegasus if i can just say the callsign

      • warg if i have to phonetic it

      • e if it can be anything

    • timing

      • 40min flight window

      • approach is less than five minutes

      • we can take some time to make checklists clear

  • Permissible

    • We are allowed to fly back for another attempt.

      • We can swap batteries between attempts

  • Questions (in order of priority to be asked on the 26th before out flight window)

    • Where can we walk with repeater as flight-line team?

      • What is the limit of the “flight-line”?

      • Can we stand near the hanger?

      • Can we stand near the runway?

      • MUST SFAY AT TENT

    • Correlation between “landing time” from email and CONOPS 21.e “designated time window”?

      • How long is the specified landing window?

        • “21.a In the email on Thursday evening, Bidders will be given a specific time window to land (see Para16.c). The time window will be at least 1 min long.” ← we have not been told how long the window is yet via email or in person

      • Is the 20 minuts mean anytime after that we can land?

      • 20 TO 21 IS THE MINUTE

    • Does callsign need to be copied phonetically?

      • Dont care

    • Can we get the cargo and barbies before the flight window?

      • most likely answer is no as per 21.b but worth askin

      • DIDNT ASK, LOTS OF TIME

    • Are there any points awarded if we land at a different landing pad than the one we initially called out over the radio?

      • CONOPs doesnt rlly say this

      • YES ITS ALLOWED

    • For the callouts, where is “start of approach”?

      • is it at the first waypoint or the last one given in CONOPS?

      • 350 FT

    • If we damage the drone in an attempt and cannot fly it back, are we allowed to manually recover and attempt to repair the drone within our flight window?

      • CONOPs doesnt explicitely disallow but seems not advised.

      • THEY WILL HELP YS DRIVE IT BACK

      • NON FLIGHTLINE CAN AS LONG AS NO COMMS

    • Does yawing violate the requirement of “hovering” from 21.e?

      • are we allowed to do this before the specified landing window?

      • Low priority question bc we dont need to do this

      • ALLOWED

  • More questions

    • Can we claim a tent

      • NO NEED, MOST TENTS ARE EQUAL

    • Can we pack cargo and barbies ahead of time

      • WE HAVE PLENTY OF TIME, NO NEED

    • can flight line team indicate to the recovery team if we want the drone to be recoverred or not after a landing?

      • recovery team will not be on flight line

      • how do they know if we wanna takeoff again or not?

    • can we get the nice corner table?